Create new Runrun.it projects from new or updated Google Sheets rows
Manage your workflow effectively with this seamless integration between Google Sheets and Runrun.it. Whenever there is a new or updated row in your Google Sheets, a corresponding project will be created in Runrun.it. This automation saves time and ensures no task slips through the cracks as your spreadsheet data is directly transformed into manageable projects.
Manage your workflow effectively with this seamless integration between Google Sheets and Runrun.it. Whenever there is a new or updated row in your Google Sheets, a corresponding project will be created in Runrun.it. This automation saves time and ensures no task slips through the cracks as your spreadsheet data is directly transformed into manageable projects.
- When this happens...New or Updated Spreadsheet Row
Triggers when a new row is added or modified in a spreadsheet.
- automatically do this!Create Project
Project Dropdown.
- Free forever for core features
- 14 day trial for premium features & apps
Dont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Try ItDrive
Try ItDont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Column NameRequired
Index
Dont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Try ItDont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Use Timezone set up on the spreadsheet to format date values?