Add KPI data points in MPOWR Envision with new rows on Google Sheets
Are you tired of redundant data entry? Many times the data for a KPI in MPOWR Envision is being entered and stored in another software application or spreadsheet. With this integration, when that data is entered into a new spreadsheet row in a specified Google Sheets spreadsheet, its data will be sent automatically into MPOWR Envision as a KPI data point.
Are you tired of redundant data entry? Many times the data for a KPI in MPOWR Envision is being entered and stored in another software application or spreadsheet. With this integration, when that data is entered into a new spreadsheet row in a specified Google Sheets spreadsheet, its data will be sent automatically into MPOWR Envision as a KPI data point.
- When this happens...New Spreadsheet Row
Triggers when a new row is added to the bottom of a spreadsheet.
- automatically do this!Add KPI Data Point
Add a data point to an existing Key Performance Indicator (KPI)
- Free forever for core features
- 14 day trial for premium features & apps
Dont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Try ItDrive
Try ItDont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Column NameRequired
Index
Dont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Try ItDont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Use Timezone set up on the spreadsheet to format date values?