Create prework tasks from scheduled jobs for dispatch
Create prework tasks from scheduled jobs for dispatch
Your scheduled jobs lack prework tasks, so permits, deposits, and utility calls are missed. Tasks are created and assigned to coordinators and techs with scheduled dates ahead of the job.
Overview
Field jobs often require permits, deposits, or utility arrangements that slip through when prework tasks aren’t visible. This workflow turns scheduled job records into assigned prework tasks for coordinators and techs, ensuring required actions are logged and visible same day and ready before dispatch.