Create Softr database records from new or updated Google Sheets rows
Whenever there's an update or a new row added to your Google Sheets, it will be instantly projected into your Softr database. This workflow ensures that your Softr database stays updated with the latest data from your Google Sheets, eliminating the need for constant manual data transfer. It's a time-saving solution for maintaining current and accurate records in your Softr database.
Whenever there's an update or a new row added to your Google Sheets, it will be instantly projected into your Softr database. This workflow ensures that your Softr database stays updated with the latest data from your Google Sheets, eliminating the need for constant manual data transfer. It's a time-saving solution for maintaining current and accurate records in your Softr database.
- When this happens...New or Updated Spreadsheet Row
Triggers when a new row is added or modified in a spreadsheet.
- automatically do this!Create Database Record
Creates a record in a database.
- Free forever for core features
- 14 day trial for premium features & apps
Dont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Try ItDrive
Try ItDont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Column NameRequired
Index
Dont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Try ItDont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Use Timezone set up on the spreadsheet to format date values?