Create new flow.team posts from new Google Sheets rows
With this automation, you can streamline your content updates. Whenever a new row is added to your Google Sheets, a post is created in the flow.team app. This provides an efficient system for updating your team with new data or information, ensuring everyone is always in the loop.
With this automation, you can streamline your content updates. Whenever a new row is added to your Google Sheets, a post is created in the flow.team app. This provides an efficient system for updating your team with new data or information, ensuring everyone is always in the loop.
- When this happens...New Spreadsheet Row
Triggers when a new row is added to the bottom of a spreadsheet.
- automatically do this!Create Post
Create new post to project.
- Free forever for core features
- 14 day trial for premium features & apps
Dont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Try ItDrive
Try ItDont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Column NameRequired
Index
Dont Change Sheet Structure
No Team Drive
SpreadsheetRequired
WorksheetRequired
Try ItDont Change Sheet Structure
Drive
SpreadsheetRequired
WorksheetRequired
Trigger column
Try ItDrive
SpreadsheetRequired
Try ItDrive
SpreadsheetRequired
WorksheetRequired
Use Timezone set up on the spreadsheet to format date values?




