Update master project rows from field scheduling changes
Update master project rows from field scheduling changes
Your scheduling sheet updates can leave the master tracker out of sync, causing dispatch mistakes and missed campaign windows. It keeps the master tracker current for same-day dispatch.
Overview
Field schedule edits frequently leave your master tracker stale, which creates confusion for dispatch coordinators and risks missed on-car campaign windows. This flow pushes those edits into the master project sheet so operations teams see accurate assignments same day and can dispatch reliably.