# Oracle Primavera Cloud + Smartsheet Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/smartsheet
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Smartsheet in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · ACT_CREATE_WORKSPACE`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "smartsheet", owner: "me" });

const { data } = await zapier.runAction({
  app: "smartsheet",
  actionType: "write",
  action: "ACT_CREATE_WORKSPACE",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action smartsheet write ACT_CREATE_WORKSPACE \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Smartsheet

### Identity
Smartsheet is a leading cloud-based platform for work execution, enabling teams and organizations to plan, capture, manage, automate, and report on work at scale, resulting in more efficient processes and better business outcomes.

- App slug: smartsheet
- Operations published here: 25 (6 events, 17 functions, 2 queries)

### Authentication
Zapier connects to Smartsheet via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection smartsheet
```

### Capabilities

#### Events (6)

Events fire when something happens in Smartsheet. Use them to start a run.

##### Get Reports
[PRIVATE] Generates report list for dropdown.

- Type: read · Key: `GET_REPORTS`
- Requires: nothing
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "GET_REPORTS" })`
- CLI: `npx zapier-sdk run-action smartsheet read GET_REPORTS`

##### New Attachment
Triggers when a new attachment is added to a row.

- Type: read · Key: `NEW_ATTACHMENT`
- Requires: SHEET_ID
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "NEW_ATTACHMENT" })`
- CLI: `npx zapier-sdk run-action smartsheet read NEW_ATTACHMENT`

##### New Comment
Triggers when a new comment is added.

- Type: read · Key: `NEW_COMMENT`
- Requires: SHEET_ID
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "NEW_COMMENT" })`
- CLI: `npx zapier-sdk run-action smartsheet read NEW_COMMENT`

##### New Row
Triggers when a new row is added.

- Type: read · Key: `NEW_ROW`
- Requires: SHEET_ID
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "NEW_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet read NEW_ROW`

##### New or Updated Report Row
Triggers when rows in a report are created or updated.

- Type: read · Key: `new_updated_report_row`
- Requires: report_id
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "new_updated_report_row" })`
- CLI: `npx zapier-sdk run-action smartsheet read new_updated_report_row`

##### Updated Row
Triggers when cells in a row are updated or created (based on your settings).

- Type: read · Key: `updated_row_v3`
- Requires: nothing
- SDK: `runAction({ app: "smartsheet", actionType: "read", action: "updated_row_v3" })`
- CLI: `npx zapier-sdk run-action smartsheet read updated_row_v3`

#### Functions (17)

Functions change something in Smartsheet.

##### Create Workspace
Creates a Workspace.

- Type: write · Key: `ACT_CREATE_WORKSPACE`
- Requires: name
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ACT_CREATE_WORKSPACE" })`
- CLI: `npx zapier-sdk run-action smartsheet write ACT_CREATE_WORKSPACE`

##### Add Attachment to Row
Adds a file attachment to a row.

- Type: write · Key: `ADD_ATTACHMENT`
- Requires: SHEET_ID, ROW_ID, file
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ADD_ATTACHMENT" })`
- CLI: `npx zapier-sdk run-action smartsheet write ADD_ATTACHMENT`

##### Add Discussion to Row
Adds discussion to row.

- Type: write · Key: `ADD_DISCUSSIONROW`
- Requires: SHEET_ID, rowId, title, comment
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ADD_DISCUSSIONROW" })`
- CLI: `npx zapier-sdk run-action smartsheet write ADD_DISCUSSIONROW`

##### Add Row to Sheet
Add a row to a sheet.

- Type: write · Key: `ADD_ROW`
- Requires: SHEET_ID
- Optional: TO_TOP
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ADD_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet write ADD_ROW`

##### Copy Folder
Copies folder to another destination.

- Type: write · Key: `COPY_FOLDER`
- Requires: folderId, destinationId, newName
- Optional: sourceWorkspaceId, destinationWorkspaceId
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "COPY_FOLDER" })`
- CLI: `npx zapier-sdk run-action smartsheet write COPY_FOLDER`

##### Copy Row
Copies row to another sheet.

- Type: write · Key: `COPY_ROW`
- Requires: SHEET_ID, DEST_SHEETID, rows
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "COPY_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet write COPY_ROW`

##### Copy Workspace
Creates a copy of the specified Workspace.

- Type: write · Key: `COPY_WORKSPACE`
- Requires: workspaceId, newName
- Optional: includes, skipRemap
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "COPY_WORKSPACE" })`
- CLI: `npx zapier-sdk run-action smartsheet write COPY_WORKSPACE`

##### Export Column
Exports the row data for a specific sheet column. Supports parent row filtering.

- Type: write · Key: `get_column_values`
- Requires: sheet_id, column_id
- Optional: parent_row_id
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "get_column_values" })`
- CLI: `npx zapier-sdk run-action smartsheet write get_column_values`

##### Move Row
Moves row to another sheet.

- Type: write · Key: `MOVE_ROW`
- Requires: SHEET_ID, DEST_SHEETID, rows
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "MOVE_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet write MOVE_ROW`

##### Create Sheet From Existing Sheet
Create a new sheet from an existing sheet.

- Type: write · Key: `NEW_SHEET_COPY`
- Requires: TARGET_LOCATION, SHEET_ID, INCLUDE_DATA, INCLUDE_ATTACHMENTS, INCLUDE_DISCUSSIONS, SHEET_NAME
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "NEW_SHEET_COPY" })`
- CLI: `npx zapier-sdk run-action smartsheet write NEW_SHEET_COPY`

##### Create Sheet From Template
Create a new sheet from a template.

- Type: write · Key: `NEW_SHEET_TEMPLATE`
- Requires: TARGET_LOCATION, TEMPLATE_ID, INCLUDE_DATA, INCLUDE_ATTACHMENTS, INCLUDE_DISCUSSIONS, SHEET_NAME
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "NEW_SHEET_TEMPLATE" })`
- CLI: `npx zapier-sdk run-action smartsheet write NEW_SHEET_TEMPLATE`

##### Update Row
Update an existing row with new values. Requires a row ID.

- Type: write · Key: `ROW_UPDATE`
- Requires: SHEET_ID, ROW_ID
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ROW_UPDATE" })`
- CLI: `npx zapier-sdk run-action smartsheet write ROW_UPDATE`

##### Send Row
Send a row via email.

- Type: write · Key: `SEND_ROW`
- Requires: SHEET_ID, EMAIL_ADDRESS, rows
- Optional: EMAIL_SUBJECT, EMAIL_MESSAGE, CC_ME, includeAttachments, includeDiscussions
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "SEND_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet write SEND_ROW`

##### Send Sheet
Send a sheet via email (as PDF or Excel).

- Type: write · Key: `SEND_SHEET`
- Requires: SHEET_ID, EMAIL_ADDRESS, SHEET_FORMAT
- Optional: EMAIL_SUBJECT, EMAIL_MESSAGE, CC_ME, PAPER_SIZE
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "SEND_SHEET" })`
- CLI: `npx zapier-sdk run-action smartsheet write SEND_SHEET`

##### Share Sheet
Share a sheet.

- Type: write · Key: `SHARE_SHEET`
- Requires: SHEET_ID, EMAIL_ADDRESS, ACCESS_LEVEL, SEND_EMAIL
- Optional: EMAIL_SUBJECT, EMAIL_MESSAGE, CC_ME
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "SHARE_SHEET" })`
- CLI: `npx zapier-sdk run-action smartsheet write SHARE_SHEET`

##### Share Workspace
Share a workspace.

- Type: write · Key: `SHARE_WORKSPACE`
- Requires: WORKSPACE_ID, EMAIL_ADDRESS, ACCESS_LEVEL, SEND_EMAIL
- Optional: EMAIL_SUBJECT, EMAIL_MESSAGE, CC_ME
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "SHARE_WORKSPACE" })`
- CLI: `npx zapier-sdk run-action smartsheet write SHARE_WORKSPACE`

##### Find sheet Row (Legacy)
Find a row in a specified sheet using a query.

- Type: write · Key: `ae:7597`
- Requires: nothing
- SDK: `runAction({ app: "smartsheet", actionType: "write", action: "ae:7597" })`
- CLI: `npx zapier-sdk run-action smartsheet write ae:7597`

#### Queries (2)

Queries read from Smartsheet and return data. They change nothing.

##### Find Attachment
Find an attachment by row ID.

- Type: search · Key: `FIND_ATTACHMENT`
- Requires: SHEET_ID, ROW_ID
- SDK: `runAction({ app: "smartsheet", actionType: "search", action: "FIND_ATTACHMENT" })`
- CLI: `npx zapier-sdk run-action smartsheet search FIND_ATTACHMENT`

##### Find Sheet Row
Find Sheet Row

- Type: search · Key: `FIND_SHEET_ROW`
- Requires: SHEET_ID, QUERY
- SDK: `runAction({ app: "smartsheet", actionType: "search", action: "FIND_SHEET_ROW" })`
- CLI: `npx zapier-sdk run-action smartsheet search FIND_SHEET_ROW`

## Frequently asked questions about automating with Oracle Primavera Cloud and Smartsheet

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Smartsheet integrations: zapier.com/apps/smartsheet/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/smartsheet
- SDK: npmjs.com/package/@zapier/zapier-sdk