# Oracle Primavera Cloud + Salesforce Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/salesforce
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Salesforce in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_contact_to_campaign`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "salesforce", owner: "me" });

const { data } = await zapier.runAction({
  app: "salesforce",
  actionType: "write",
  action: "add_contact_to_campaign",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action salesforce write add_contact_to_campaign \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Salesforce

### Identity
Salesforce is a leading enterprise customer relationship manager (CRM) application.

- App slug: salesforce
- Operations published here: 41 (9 events, 22 functions, 8 queries, 2 search-or-write actions)

### Authentication
Zapier connects to Salesforce via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection salesforce
```

### Capabilities

#### Events (9)

Events fire when something happens in Salesforce. Use them to start a run.

##### New Case Attachment
Triggers when a new Attachment is added to a case.

- Type: read · Key: `new_case_attachment`
- Requires: nothing
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_case_attachment" })`
- CLI: `npx zapier-sdk run-action salesforce read new_case_attachment`

##### New Contact
Triggers when a new Contact is created.

- Type: read · Key: `new_contact`
- Requires: nothing
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_contact" })`
- CLI: `npx zapier-sdk run-action salesforce read new_contact`

##### New Field History Tracking Event
Triggers when a field is updated on the object specified. It will output the old and new field values.

- Type: read · Key: `new_field_history_tracking_event`
- Requires: history_object_name
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_field_history_tracking_event" })`
- CLI: `npx zapier-sdk run-action salesforce read new_field_history_tracking_event`

##### New or Updated File on Record
Triggers when an attachment, note, or content document is added or updated on any record of the specified Salesforce object.

- Type: read · Key: `new_file_on_record`
- Requires: object
- Optional: record
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_file_on_record" })`
- CLI: `npx zapier-sdk run-action salesforce read new_file_on_record`

##### New Lead
Triggers when a new Lead is created.

- Type: read · Key: `new_lead`
- Requires: nothing
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_lead" })`
- CLI: `npx zapier-sdk run-action salesforce read new_lead`

##### New Outbound Message
Triggers when a new outbound message is received in Salesforce.

- Type: read · Key: `new_outbound_message`
- Requires: nothing
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_outbound_message" })`
- CLI: `npx zapier-sdk run-action salesforce read new_outbound_message`

##### New Record
Triggers when a record of the specified Salesforce object (ie. Contact, Lead, Opportunity, etc.) is created.

- Type: read · Key: `new_record`
- Requires: object
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "new_record" })`
- CLI: `npx zapier-sdk run-action salesforce read new_record`

##### Updated Field on Record
Triggers when a field of your choosing (ie. email address, status) is updated on any record of a specified Salesforce object (ie. Contact, Lead, Opportunity, etc.).

- Type: read · Key: `updated_field_on_record`
- Requires: object
- Optional: disclaimer
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "updated_field_on_record" })`
- CLI: `npx zapier-sdk run-action salesforce read updated_field_on_record`

##### Updated Record
Triggers when any record of the specified Salesforce object (ie. Contact, Lead, Opportunity, etc.) is updated.

- Type: read · Key: `updated_record`
- Requires: object
- SDK: `runAction({ app: "salesforce", actionType: "read", action: "updated_record" })`
- CLI: `npx zapier-sdk run-action salesforce read updated_record`

#### Functions (22)

Functions change something in Salesforce.

##### Add Contact to Campaign
Adds an existing contact to an existing campaign.

- Type: write · Key: `add_contact_to_campaign`
- Requires: string::CampaignId::0::0, string::ContactId::0::0
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "add_contact_to_campaign" })`
- CLI: `npx zapier-sdk run-action salesforce write add_contact_to_campaign`

##### Add File to Record
Adds an existing file to an existing Record.

- Type: write · Key: `add_file_to_record`
- Requires: object, string::LinkedEntityId::0::0, string::ContentDocumentId::0::0, string::Visibility::0::0
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "add_file_to_record" })`
- CLI: `npx zapier-sdk run-action salesforce write add_file_to_record`

##### Add Lead to Campaign
Adds an existing lead to an existing campaign.

- Type: write · Key: `add_lead_to_campaign`
- Requires: string::CampaignId::0::0, string::LeadId::0::0
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "add_lead_to_campaign" })`
- CLI: `npx zapier-sdk run-action salesforce write add_lead_to_campaign`

##### Call Apex REST
Direct pass-through to custom Apex REST endpoints at /services/apexrest/... with minimal processing. Send exactly what your Apex class expects.

- Type: write · Key: `call_apex_rest`
- Requires: path, method
- Optional: querystring, headers, body, timeout
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "call_apex_rest" })`
- CLI: `npx zapier-sdk run-action salesforce write call_apex_rest`

##### Convert Lead to Contact
Adds an existing contact to an existing campaign.

- Type: write · Key: `convert_lead_to_contact`
- Requires: lead, account, converted_status
- Optional: opportunity, create_opportunity
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "convert_lead_to_contact" })`
- CLI: `npx zapier-sdk run-action salesforce write convert_lead_to_contact`

##### Create Attachment
Creates a new attachment (max 25MB).

- Type: write · Key: `create_attachment`
- Requires: fileURL, object
- Optional: description, isPrivate
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_attachment" })`
- CLI: `npx zapier-sdk run-action salesforce write create_attachment`

##### Create Child Records (with line item support)
Creates records from line items and sets the parent-child relationship.

- Type: write · Key: `create_child_records`
- Requires: parentObject
- Optional: useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_child_records" })`
- CLI: `npx zapier-sdk run-action salesforce write create_child_records`

##### Create Contact
Creates a new contact.

- Type: write · Key: `create_contact`
- Requires: nothing
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_contact" })`
- CLI: `npx zapier-sdk run-action salesforce write create_contact`

##### Create Enhanced Note
Creates a new enhanced note (also known as ContentNote) with optional record attachment.

- Type: write · Key: `create_content_note`
- Requires: title, content
- Optional: object
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_content_note" })`
- CLI: `npx zapier-sdk run-action salesforce write create_content_note`

##### Create File
Creates a new File (max 25MB).

- Type: write · Key: `create_file`
- Requires: fileURL
- Optional: title, description, object
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_file" })`
- CLI: `npx zapier-sdk run-action salesforce write create_file`

##### Create Lead
Creates a new lead in Salesforce.

- Type: write · Key: `create_lead`
- Requires: nothing
- Optional: useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_lead" })`
- CLI: `npx zapier-sdk run-action salesforce write create_lead`

##### Create Note
Creates a new note and links it to a parent record

- Type: write · Key: `create_note`
- Requires: title, object
- Optional: body, isPrivate, useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_note" })`
- CLI: `npx zapier-sdk run-action salesforce write create_note`

##### Create Record
Creates a new record of a specified Salesforce object.

- Type: write · Key: `create_record`
- Requires: object
- Optional: useAssignmentRules, allowDuplicates
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_record" })`
- CLI: `npx zapier-sdk run-action salesforce write create_record`

##### Create Record (UTC)
Creates a new record of a specified Salesforce object. Dates use the UTC format.

- Type: write · Key: `create_record_utc`
- Requires: object
- Optional: useAssignmentRules, allowDuplicates
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "create_record_utc" })`
- CLI: `npx zapier-sdk run-action salesforce write create_record_utc`

##### Delete Record
Deletes an existing record of a specified Salesforce object.

- Type: write · Key: `delete_record`
- Requires: object, recordId
- Optional: warning
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "delete_record" })`
- CLI: `npx zapier-sdk run-action salesforce write delete_record`

##### Launch Flow
Launch a Salesforce flow with optional input parameters. The flow will execute and return any output values.

- Type: write · Key: `launch_flow`
- Requires: flowName
- Optional: flowInputs
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "launch_flow" })`
- CLI: `npx zapier-sdk run-action salesforce write launch_flow`

##### Run Report
Execute a Salesforce Analytics report and retrieve the results with optional custom filters and groupings.

- Type: write · Key: `run_report`
- Requires: reportId
- Optional: includeDetails, numCustomFilters, rowGroupings, columnGroupings, aggregates, detailColumns, sortBy, reportFormat, advancedOptions
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "run_report" })`
- CLI: `npx zapier-sdk run-action salesforce write run_report`

##### Send Email
Sends an email using Salesforce Simple Email Actions.

- Type: write · Key: `send_email`
- Requires: toAddresses, emailSubject, bodyFormat, senderType
- Optional: ccAddresses, bccAddresses
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "send_email" })`
- CLI: `npx zapier-sdk run-action salesforce write send_email`

##### Update Contact
Updates an existing contact in Salesforce.

- Type: write · Key: `update_contact`
- Requires: record_id
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "update_contact" })`
- CLI: `npx zapier-sdk run-action salesforce write update_contact`

##### Update Lead
Updates an existing lead in Salesforce.

- Type: write · Key: `update_lead`
- Requires: record_id
- Optional: useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "update_lead" })`
- CLI: `npx zapier-sdk run-action salesforce write update_lead`

##### Update Record
Updates an existing record for a specified Salesforce object (ie. Contact, Lead, Opportunity, etc.).

- Type: write · Key: `update_record`
- Requires: object, record_id
- Optional: useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "update_record" })`
- CLI: `npx zapier-sdk run-action salesforce write update_record`

##### Update Record (UTC)
Updates an existing record of a specified Salesforce object. Dates use the UTC format.

- Type: write · Key: `update_record_utc`
- Requires: object, record_id
- Optional: useAssignmentRules
- SDK: `runAction({ app: "salesforce", actionType: "write", action: "update_record_utc" })`
- CLI: `npx zapier-sdk run-action salesforce write update_record_utc`

#### Queries (8)

Queries read from Salesforce and return data. They change nothing.

##### Custom SOQL Query
Execute custom SOQL SELECT queries with support for full query control and guided aggregate functions (COUNT, SUM, AVG, MAX, MIN).

- Type: search · Key: `custom_soql_query`
- Requires: query_type
- Optional: include_deleted
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "custom_soql_query" })`
- CLI: `npx zapier-sdk run-action salesforce search custom_soql_query`

##### Custom SOSL Query
Execute custom SOSL (Salesforce Object Search Language) queries for text-based searches across multiple objects and fields. Useful for searching Salesforce Knowledge Base articles and other cross-object text searches.

- Type: search · Key: `custom_sosl_query`
- Requires: sosl_query
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "custom_sosl_query" })`
- CLI: `npx zapier-sdk run-action salesforce search custom_sosl_query`

##### Find Child Records
Finds Child Records for a given Parent ID.

- Type: search · Key: `find_child_records_v2`
- Requires: object
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "find_child_records_v2" })`
- CLI: `npx zapier-sdk run-action salesforce search find_child_records_v2`

##### Find Record
Finds a record of a specified Salesforce object by up to two fields and values you choose.

- Type: search · Key: `find_record`
- Requires: object, searchValue
- Optional: searchField2, searchValue2, operator
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "find_record" })`
- CLI: `npx zapier-sdk run-action salesforce search find_record`

##### Find Records by Query
Finds records of a Salesforce object using a Salesforce Object Query (SOQL) WHERE clause.

- Type: search · Key: `find_records_by_query_v2`
- Requires: object, where_clause
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "find_records_by_query_v2" })`
- CLI: `npx zapier-sdk run-action salesforce search find_records_by_query_v2`

##### Find Records
Finds records of a specified Salesforce object by a field and value you choose (with line-item support).

- Type: search · Key: `find_records_v2`
- Requires: object
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "find_records_v2" })`
- CLI: `npx zapier-sdk run-action salesforce search find_records_v2`

##### Find Record by Query
Finds a record of a Salesforce object using a Salesforce Object Query (SOQL) WHERE clause.

- Type: search · Key: `find_record_by_query`
- Requires: object, whereClause
- Optional: order_by, order_direction, limit
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "find_record_by_query" })`
- CLI: `npx zapier-sdk run-action salesforce search find_record_by_query`

##### Get Record Attachments
Gets all notes and attachments for a record.

- Type: search · Key: `get_record_attachments`
- Requires: object, id
- SDK: `runAction({ app: "salesforce", actionType: "search", action: "get_record_attachments" })`
- CLI: `npx zapier-sdk run-action salesforce search get_record_attachments`

#### Search or Write Actions (2)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Record
Find a record. Optionally create a record if not found.

- Type: search_or_write · Key: `find_record`
- Requires: object, searchValue
- Optional: searchField2, searchValue2, operator, useAssignmentRules, allowDuplicates
- SDK: `runAction({ app: "salesforce", actionType: "search_or_write", action: "find_record" })`
- CLI: `npx zapier-sdk run-action salesforce search_or_write find_record`

##### Find or Create Record by Query
Finds a record of a Salesforce object using a Salesforce Object Query (SOQL) WHERE clause. Optionally create a record if not found.

- Type: search_or_write · Key: `find_record_by_query`
- Requires: object, whereClause
- Optional: order_by, order_direction, limit, useAssignmentRules, allowDuplicates
- SDK: `runAction({ app: "salesforce", actionType: "search_or_write", action: "find_record_by_query" })`
- CLI: `npx zapier-sdk run-action salesforce search_or_write find_record_by_query`

## Frequently asked questions about automating with Oracle Primavera Cloud and Salesforce

### How does the integration between Oracle Primavera Cloud and Salesforce work?

Our integration allows for seamless data transfer between Oracle Primavera Cloud and Salesforce by configuring triggers in one platform to initiate actions in the other. When specific conditions are met in Oracle Primavera, such as a project status changing, it can automatically update records or create tasks in Salesforce.

### What are some examples of triggers in this integration?

In Oracle Primavera, triggers can be set when a new project is created or when an existing project's status is updated. In Salesforce, a trigger could be when a new lead is added that might require a project manager's attention in Oracle Primavera.

### Can I automate the creation of tasks in Salesforce from Oracle Primavera updates?

Yes, you can configure triggers on specific updates or changes within projects in Oracle Primavera to automatically create corresponding tasks or events within Salesforce.

### How do we handle data synchronization between the two platforms?

We ensure that data synchronization is handled through real-time updates by mapping fields correctly and setting precise conditions for data transfers. This way, all relevant information stays up-to-date without requiring manual intervention.

### Is it possible to customize which fields are mapped between Oracle Primavera Cloud and Salesforce?

Yes, field mappings can be customized according to your specific business needs. You can choose which fields from Oracle Primavera correspond with those in Salesforce, ensuring that only relevant data is shared across platforms.

### What should I do if there is an error during the integration process?

If you encounter an error during the integration process, check that all fields are correctly mapped and that any trigger conditions set up are being met. Detailed logs and notifications will also guide you in troubleshooting specific issues.

### Can I set conditions for when certain actions should not be triggered?

Absolutely. You can specify conditions under which actions should not trigger. For instance, if a project update occurs but does not meet certain criteria defined within your workflow settings, no updates will be pushed to Salesforce.

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Salesforce integrations: zapier.com/apps/salesforce/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/salesforce
- SDK: npmjs.com/package/@zapier/zapier-sdk