# Oracle Primavera Cloud + Odoo ERP Self Hosted Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/openerp
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Odoo ERP Self Hosted in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · event`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "openerp", owner: "me" });

const { data } = await zapier.runAction({
  app: "openerp",
  actionType: "write",
  action: "event",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action openerp write event \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Odoo ERP Self Hosted

### Identity
Odoo ERP Self Hosted (formerly known as OpenERP) is a powerful open source platform with dozens of apps to help you grow your business. Available apps range from CRM to eCommerce, and from accounting to manufacturing and project management. This Odoo ERP Self Hosted integration works with all of Odoo ERP's products. It works with instances that are self-hosted.

- App slug: openerp
- Operations published here: 18 (10 events, 8 functions)

### Authentication
Zapier connects to Odoo ERP Self Hosted via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection openerp
```

### Capabilities

#### Events (10)

Events fire when something happens in Odoo ERP Self Hosted. Use them to start a run.

##### New Database
Triggers when you add a new database.

- Type: read · Key: `database`
- Requires: nothing
- SDK: `runAction({ app: "openerp", actionType: "read", action: "database" })`
- CLI: `npx zapier-sdk run-action openerp read database`

##### New Calendar Event
Triggers when you add a new Calendar Event. You will need to have the Calendar module installed.

- Type: read · Key: `event`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "event" })`
- CLI: `npx zapier-sdk run-action openerp read event`

##### New Lead/Opportunity
Triggers when you add a new Lead/Opportunity. You will need to have the CRM module installed.

- Type: read · Key: `lead`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "lead" })`
- CLI: `npx zapier-sdk run-action openerp read lead`

##### New Module
Triggers when you add a new model.

- Type: read · Key: `model`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "model" })`
- CLI: `npx zapier-sdk run-action openerp read model`

##### New Note
Triggers when you add a new Note. You will need to have the Note module installed.

- Type: read · Key: `note`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "note" })`
- CLI: `npx zapier-sdk run-action openerp read note`

##### New Product
Triggers when you add a new Product. You will need to have the ECommerce module installed.

- Type: read · Key: `product`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "product" })`
- CLI: `npx zapier-sdk run-action openerp read product`

##### New Record
Triggers when a new record is added in a model (choose any model you have installed).

- Type: read · Key: `record`
- Requires: dbname, model
- SDK: `runAction({ app: "openerp", actionType: "read", action: "record" })`
- CLI: `npx zapier-sdk run-action openerp read record`

##### New Project Task
Triggers when you add a new Project Task. You will need to have the Project module installed.

- Type: read · Key: `task`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "task" })`
- CLI: `npx zapier-sdk run-action openerp read task`

##### New Calendar Todo
Triggers when you add a new Calendar Todo. You will need to have the Calendar module installed.

- Type: read · Key: `todo`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "todo" })`
- CLI: `npx zapier-sdk run-action openerp read todo`

##### New User
Triggers when you add a new User. You will need to have the Users module installed.

- Type: read · Key: `user`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "read", action: "user" })`
- CLI: `npx zapier-sdk run-action openerp read user`

#### Functions (8)

Functions change something in Odoo ERP Self Hosted.

##### Create Calendar Event
Create a new Calendar Event.

- Type: write · Key: `event`
- Requires: dbname
- Optional: creates_event_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "event" })`
- CLI: `npx zapier-sdk run-action openerp write event`

##### Create Lead/Opportunity
Create a new Lead/Opportunity.

- Type: write · Key: `lead`
- Requires: dbname
- Optional: creates_lead_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "lead" })`
- CLI: `npx zapier-sdk run-action openerp write lead`

##### Create Note
Create a new Note.

- Type: write · Key: `note`
- Requires: dbname
- Optional: creates_note_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "note" })`
- CLI: `npx zapier-sdk run-action openerp write note`

##### Create Product
Create a new Product.

- Type: write · Key: `product`
- Requires: dbname
- Optional: creates_product_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "product" })`
- CLI: `npx zapier-sdk run-action openerp write product`

##### Create Record
Create a new record in a model of your choice.

- Type: write · Key: `record`
- Requires: dbname, model
- SDK: `runAction({ app: "openerp", actionType: "write", action: "record" })`
- CLI: `npx zapier-sdk run-action openerp write record`

##### Create Project Task
Create a new Project Task.

- Type: write · Key: `task`
- Requires: dbname
- Optional: creates_task_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "task" })`
- CLI: `npx zapier-sdk run-action openerp write task`

##### Create Calendar Todo
Create a new Calendar Todo.

- Type: write · Key: `todo`
- Requires: dbname
- Optional: creates_todo_copy
- SDK: `runAction({ app: "openerp", actionType: "write", action: "todo" })`
- CLI: `npx zapier-sdk run-action openerp write todo`

##### Create User
Create a new User.

- Type: write · Key: `user`
- Requires: dbname
- SDK: `runAction({ app: "openerp", actionType: "write", action: "user" })`
- CLI: `npx zapier-sdk run-action openerp write user`

## Frequently asked questions about automating with Oracle Primavera Cloud and Odoo ERP Self Hosted

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Odoo ERP Self Hosted integrations: zapier.com/apps/openerp/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/openerp
- SDK: npmjs.com/package/@zapier/zapier-sdk