# Oracle Primavera Cloud + Odoo CRM Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/odoo
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Odoo CRM in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · lead`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "odoo", owner: "me" });

const { data } = await zapier.runAction({
  app: "odoo",
  actionType: "write",
  action: "lead",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action odoo write lead \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Odoo CRM

### Identity
Odoo is a powerful open source platform with dozens of apps to help you grow your business. Available apps range from CRM to eCommerce, and from accounting to manufacturing and project management. This Odoo CRM integration allows users to connect Odoo's CRM product to other apps. This integration works with instances that are cloud hosted at "odoo.com."

- App slug: odoo
- Operations published here: 4 (1 event, 1 function, 2 queries)

### Authentication
Zapier connects to Odoo CRM via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection odoo
```

### Capabilities

#### Events (1)

Events fire when something happens in Odoo CRM. Use them to start a run.

##### New Lead
Triggers on a new lead.

- Type: read · Key: `lead`
- Requires: nothing
- SDK: `runAction({ app: "odoo", actionType: "read", action: "lead" })`
- CLI: `npx zapier-sdk run-action odoo read lead`

#### Functions (1)

Functions change something in Odoo CRM.

##### Create Lead
Creates a lead.

- Type: write · Key: `lead`
- Requires: nothing
- SDK: `runAction({ app: "odoo", actionType: "write", action: "lead" })`
- CLI: `npx zapier-sdk run-action odoo write lead`

#### Queries (2)

Queries read from Odoo CRM and return data. They change nothing.

##### Find Contact
Finds an existing contact by name or email address.

- Type: search · Key: `find_contact`
- Requires: nothing
- Optional: name, email
- SDK: `runAction({ app: "odoo", actionType: "search", action: "find_contact" })`
- CLI: `npx zapier-sdk run-action odoo search find_contact`

##### Find Opportunity
Finds opportunities by a chosen field (Email, ID, Title, Salesperson, or Company).

- Type: search · Key: `find_opportunity`
- Requires: search_field
- SDK: `runAction({ app: "odoo", actionType: "search", action: "find_opportunity" })`
- CLI: `npx zapier-sdk run-action odoo search find_opportunity`

## Frequently asked questions about automating with Oracle Primavera Cloud and Odoo CRM

### How do I start the integration process between Oracle Primavera Cloud and Odoo CRM?

To begin integrating Oracle Primavera Cloud with Odoo CRM, you need to set up both platforms for API access. Our platform provides detailed documentation and support to guide you through connecting the two systems using triggers and actions tailored to your workflow.

### What are the common triggers available when integrating these platforms?

Common triggers include new project creation in Oracle Primavera Cloud, updates to project statuses, or schedule changes. These can then initiate actions in Odoo CRM, such as creating a new task or updating client records.

### Can I customize the actions within Odoo CRM based on specific triggers from Oracle Primavera Cloud?

Yes, customization is possible. You can tailor actions in Odoo CRM based on various triggers from Oracle Primavera Cloud, such as automatically sending notifications or generating reports when a project milestone is reached.

### Are there any prerequisites for integrating these systems?

Ensure that both Oracle Primavera Cloud and Odoo CRM accounts have admin permissions for API access. Additionally, verify that both platforms are up-to-date to support the latest integration features we offer.

### How secure is the data transfer between Oracle Primavera Cloud and Odoo CRM during integration?

We prioritize security by using industry-standard encryption protocols for data transfer between Oracle Primavera Cloud and Odoo CRM, ensuring all interactions respect user privacy and data protection regulations.

### What support options are available if I encounter issues during integration?

Our support team is available 24/7 via email and chat. We also offer comprehensive online resources including troubleshooting guides specifically for integrations involving Oracle Primavera Cloud and Odoo CRM.

### Can I track project progress in real-time within Odoo CRM after integration?

Yes, after setting up the integration, real-time project progress tracking becomes feasible as updates from Oracle Primavera trigger immediate sync actions within your Odoo CRM dashboard.

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Odoo CRM integrations: zapier.com/apps/odoo/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/odoo
- SDK: npmjs.com/package/@zapier/zapier-sdk