# Oracle Primavera Cloud + Notion Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/notion
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Notion in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_block_to_page`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "notion", owner: "me" });

const { data } = await zapier.runAction({
  app: "notion",
  actionType: "write",
  action: "add_block_to_page",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action notion write add_block_to_page \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Notion

### Identity
A new tool that blends your everyday work apps into one. It's the all-in-one workspace for you and your team.

- App slug: notion
- Operations published here: 32 (6 events, 14 functions, 11 queries, 1 search-or-write action)

### Authentication
Zapier connects to Notion via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection notion
```

### Capabilities

#### Events (6)

Events fire when something happens in Notion. Use them to start a run.

##### New Comment
Triggers when a new comment is created in your Notion workspace. You can filter by database or specific page.

- Type: read · Key: `new_comment`
- Requires: nothing
- Optional: database_id, datasource_id, page_id
- SDK: `runAction({ app: "notion", actionType: "read", action: "new_comment" })`
- CLI: `npx zapier-sdk run-action notion read new_comment`

##### New Data Source Item
Triggers when a new item is created in a data source.

- Type: read · Key: `new_data_source_item`
- Requires: datasource
- SDK: `runAction({ app: "notion", actionType: "read", action: "new_data_source_item" })`
- CLI: `npx zapier-sdk run-action notion read new_data_source_item`

##### Updated Content in Data Source Item
Triggers when the content in a data source item is updated.

- Type: read · Key: `updated_data_source_item_content`
- Requires: datasource
- Optional: enhanced_markdown_content_help
- SDK: `runAction({ app: "notion", actionType: "read", action: "updated_data_source_item_content" })`
- CLI: `npx zapier-sdk run-action notion read updated_data_source_item_content`

##### Updated Properties in Data Source Item
Triggers when one or more properties of a data source item are updated.

- Type: read · Key: `updated_data_source_item_properties`
- Requires: datasource
- SDK: `runAction({ app: "notion", actionType: "read", action: "updated_data_source_item_properties" })`
- CLI: `npx zapier-sdk run-action notion read updated_data_source_item_properties`

##### Updated Content in Page
Triggers when the content in a page is updated.

- Type: read · Key: `updated_page_content`
- Requires: page_id
- Optional: enhanced_markdown_content_help
- SDK: `runAction({ app: "notion", actionType: "read", action: "updated_page_content" })`
- CLI: `npx zapier-sdk run-action notion read updated_page_content`

##### Updated Properties on a Page
Triggers when one or more properties of a page are updated.

- Type: read · Key: `updated_page_properties`
- Requires: page
- Optional: datasource, watched_properties
- SDK: `runAction({ app: "notion", actionType: "read", action: "updated_page_properties" })`
- CLI: `npx zapier-sdk run-action notion read updated_page_properties`

#### Functions (14)

Functions change something in Notion.

##### Add Block to Page
Adds a new content block to an existing Notion page. Supports various block types including paragraphs, headings, lists, to-dos, callouts, code blocks, and more.

- Type: write · Key: `add_block_to_page`
- Requires: page_id, block_type
- Optional: content, language, checked, icon_emoji
- SDK: `runAction({ app: "notion", actionType: "write", action: "add_block_to_page" })`
- CLI: `npx zapier-sdk run-action notion write add_block_to_page`

##### Archive Data Source Item
Soft deletes an item in a data source.

- Type: write · Key: `archive_database_item`
- Requires: page
- Optional: datasource
- SDK: `runAction({ app: "notion", actionType: "write", action: "archive_database_item" })`
- CLI: `npx zapier-sdk run-action notion write archive_database_item`

##### Add Comment
Adds a new comment to a Page.

- Type: write · Key: `comment`
- Requires: page_id, comment
- SDK: `runAction({ app: "notion", actionType: "write", action: "comment" })`
- CLI: `npx zapier-sdk run-action notion write comment`

##### Create Data Source Item
Creates an item in a data source.

- Type: write · Key: `create_database_item`
- Requires: nothing
- Optional: datasource, template_mode
- SDK: `runAction({ app: "notion", actionType: "write", action: "create_database_item" })`
- CLI: `npx zapier-sdk run-action notion write create_database_item`

##### Create Page
Creates a Page inside a parent page

- Type: write · Key: `create_page`
- Requires: parent_page
- Optional: title, content, icon, cover
- SDK: `runAction({ app: "notion", actionType: "write", action: "create_page" })`
- CLI: `npx zapier-sdk run-action notion write create_page`

##### Add Content to Page
Adds Content to a Page.

- Type: write · Key: `page_content`
- Requires: page_id, content
- Optional: content_format
- SDK: `runAction({ app: "notion", actionType: "write", action: "page_content" })`
- CLI: `npx zapier-sdk run-action notion write page_content`

##### Restore Data Source Item
Restores a data source item which was previously archived.

- Type: write · Key: `restore_database_item`
- Requires: page
- SDK: `runAction({ app: "notion", actionType: "write", action: "restore_database_item" })`
- CLI: `npx zapier-sdk run-action notion write restore_database_item`

##### Update Database
Updates a Notion database attributes including title, parent location, inline display, icon, archive status, and lock status.

- Type: write · Key: `update_database`
- Requires: database_id
- Optional: title, move_to_type, is_inline, icon_emoji, in_trash, is_locked
- SDK: `runAction({ app: "notion", actionType: "write", action: "update_database" })`
- CLI: `npx zapier-sdk run-action notion write update_database`

##### Update Data Source Item
Updates a data source item.

- Type: write · Key: `update_database_item`
- Requires: page
- Optional: datasource, content, content_format
- SDK: `runAction({ app: "notion", actionType: "write", action: "update_database_item" })`
- CLI: `npx zapier-sdk run-action notion write update_database_item`

##### Update Data Source Schema
Updates a Notion data source schema including properties and title. Allows adding, modifying, or removing data source properties to change the schema.

- Type: write · Key: `update_data_source_schema`
- Requires: datasource
- Optional: title, icon_emoji, properties_json
- SDK: `runAction({ app: "notion", actionType: "write", action: "update_data_source_schema" })`
- CLI: `npx zapier-sdk run-action notion write update_data_source_schema`

##### Upload File to Data Source Item
Uploads a file to a files property in a data source item.

- Type: write · Key: `upload_file_to_data_source_item`
- Requires: datasource, page, file_property, file
- Optional: file_upload_note, file_name
- SDK: `runAction({ app: "notion", actionType: "write", action: "upload_file_to_data_source_item" })`
- CLI: `npx zapier-sdk run-action notion write upload_file_to_data_source_item`

##### Upload File to Page or Block
Uploads a file to a page or block in Notion.

- Type: write · Key: `upload_file_to_page_block`
- Requires: page_id, file
- Optional: file_upload_note, file_name
- SDK: `runAction({ app: "notion", actionType: "write", action: "upload_file_to_page_block" })`
- CLI: `npx zapier-sdk run-action notion write upload_file_to_page_block`

##### Retrieve Database
This action retrieves a database in Notion using the ID of the database.

- Type: write · Key: `ae:41702`
- Requires: nothing
- SDK: `runAction({ app: "notion", actionType: "write", action: "ae:41702" })`
- CLI: `npx zapier-sdk run-action notion write ae:41702`

##### Retrieve a Page
This action retrieves a specific page from Notion using its ID. The page id can be a normal page or a database item.  https://developers.notion.com/reference/retrieve-a-page

- Type: write · Key: `ae:38538`
- Requires: nothing
- SDK: `runAction({ app: "notion", actionType: "write", action: "ae:38538" })`
- CLI: `npx zapier-sdk run-action notion write ae:38538`

#### Queries (11)

Queries read from Notion and return data. They change nothing.

##### Retrieve Block Children
Retrieves the children of a block, with any text content rendered as Markdown.

- Type: search · Key: `block_children`
- Requires: blockId
- SDK: `runAction({ app: "notion", actionType: "search", action: "block_children" })`
- CLI: `npx zapier-sdk run-action notion search block_children`

##### Get Page Comments
Retrieves comments from a Page.

- Type: search · Key: `comments_v2`
- Requires: page_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "comments_v2" })`
- CLI: `npx zapier-sdk run-action notion search comments_v2`

##### Find Data Source Items
Searches for items in a data source by its properties.

- Type: search · Key: `find_data_source_item`
- Requires: nothing
- Optional: datasource
- SDK: `runAction({ app: "notion", actionType: "search", action: "find_data_source_item" })`
- CLI: `npx zapier-sdk run-action notion search find_data_source_item`

##### Get Block
Retrieves a block by ID.

- Type: search · Key: `get_block`
- Requires: block_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "get_block" })`
- CLI: `npx zapier-sdk run-action notion search get_block`

##### Get Block Children
Retrieves child blocks of a parent block or page with support for pagination.

- Type: search · Key: `get_block_children`
- Requires: block_id
- Optional: page_size, start_cursor
- SDK: `runAction({ app: "notion", actionType: "search", action: "get_block_children" })`
- CLI: `npx zapier-sdk run-action notion search get_block_children`

##### Get Page and Children
Retrieves a page by its ID and all of its block children.

- Type: search · Key: `get_page_and_children`
- Requires: page_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "get_page_and_children" })`
- CLI: `npx zapier-sdk run-action notion search get_page_and_children`

##### Get Page or Data Source Item by ID
Retrieves a specific page or data source item from Notion using its ID.

- Type: search · Key: `get_page_or_database_item_by_id`
- Requires: page_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "get_page_or_database_item_by_id" })`
- CLI: `npx zapier-sdk run-action notion search get_page_or_database_item_by_id`

##### Find Page (By Title)
Searches for a page by title.

- Type: search · Key: `page_by_title`
- Requires: title, exact_match
- SDK: `runAction({ app: "notion", actionType: "search", action: "page_by_title" })`
- CLI: `npx zapier-sdk run-action notion search page_by_title`

##### Get Page Property
Retrieves a specific property value from a Notion page.

- Type: search · Key: `page_property`
- Requires: page_id, property_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "page_property" })`
- CLI: `npx zapier-sdk run-action notion search page_property`

##### Query Data Source (Advanced)
Query a Notion data source with advanced filtering and sorting using JSON. Supports complex logic like AND/OR conditions, multiple sorts, and all Notion filter types.

- Type: search · Key: `query_database_advanced`
- Requires: nothing
- Optional: datasource, query_json
- SDK: `runAction({ app: "notion", actionType: "search", action: "query_database_advanced" })`
- CLI: `npx zapier-sdk run-action notion search query_database_advanced`

##### Get User Details
Retrieves user information by ID.

- Type: search · Key: `user_details`
- Requires: user_id
- SDK: `runAction({ app: "notion", actionType: "search", action: "user_details" })`
- CLI: `npx zapier-sdk run-action notion search user_details`

#### Search or Write Actions (1)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Data Source Item
Searches for an item in a data source matching the provided fields, or creates one if it does not exist.

- Type: search_or_write · Key: `find_data_source_item`
- Requires: nothing
- Optional: datasource, template_mode
- SDK: `runAction({ app: "notion", actionType: "search_or_write", action: "find_data_source_item" })`
- CLI: `npx zapier-sdk run-action notion search_or_write find_data_source_item`

## Frequently asked questions about automating with Oracle Primavera Cloud and Notion

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Notion integrations: zapier.com/apps/notion/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/notion
- SDK: npmjs.com/package/@zapier/zapier-sdk