# Oracle Primavera Cloud + Mobile Message Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/mobile-message-ca21345
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Mobile Message in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_contact_to_list`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "mobile-message-ca21345", owner: "me" });

const { data } = await zapier.runAction({
  app: "mobile-message-ca21345",
  actionType: "write",
  action: "add_contact_to_list",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action mobile-message-ca21345 write add_contact_to_list \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Mobile Message

### Identity
Instantly send an SMS to any Australian mobile phone number, using your Mobile Message account.

- App slug: mobile-message-ca21345
- Operations published here: 17 (2 events, 13 functions, 2 queries)

### Authentication
Zapier connects to Mobile Message via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection mobile-message-ca21345
```

### Capabilities

#### Events (2)

Events fire when something happens in Mobile Message. Use them to start a run.

##### New SMS Delivery Status
Triggers when an SMS delivery status changes (delivered or failed).

- Type: read · Key: `delivery_status`
- Requires: nothing
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "read", action: "delivery_status" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 read delivery_status`

##### New Inbound SMS
Triggers when an inbound SMS is received.

- Type: read · Key: `inbound_sms`
- Requires: nothing
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "read", action: "inbound_sms" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 read inbound_sms`

#### Functions (13)

Functions change something in Mobile Message.

##### Add Contact to List
Adds a contact to a contact list.

- Type: write · Key: `add_contact_to_list`
- Requires: list_id
- Optional: contact_id, number
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "add_contact_to_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write add_contact_to_list`

##### Add Unsubscribe
Adds a phone number to your unsubscribe (opt-out) list.

- Type: write · Key: `add_unsubscribe`
- Requires: number
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "add_unsubscribe" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write add_unsubscribe`

##### Cancel Scheduled Message
Cancels a scheduled message and refunds the credits.

- Type: write · Key: `cancel_message`
- Requires: nothing
- Optional: message_id, custom_ref
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "cancel_message" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write cancel_message`

##### Create Contact
Creates a new contact in your Mobile Message address book.

- Type: write · Key: `create_contact`
- Requires: number
- Optional: first_name, last_name, company, other
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "create_contact" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write create_contact`

##### Create Contact List
Creates a new contact list.

- Type: write · Key: `create_list`
- Requires: name
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "create_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write create_list`

##### Delete Contact
Deletes a contact from your Mobile Message address book.

- Type: write · Key: `delete_contact`
- Requires: contact_id
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "delete_contact" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write delete_contact`

##### Delete Contact List
Deletes a contact list (does not delete the contacts themselves).

- Type: write · Key: `delete_list`
- Requires: list_id
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "delete_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write delete_list`

##### Remove Contact From List
Removes a contact from a contact list.

- Type: write · Key: `remove_contact_from_list`
- Requires: list_id
- Optional: contact_id, number
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "remove_contact_from_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write remove_contact_from_list`

##### Remove Unsubscribe
Removes a phone number from your unsubscribe (opt-out) list.

- Type: write · Key: `remove_unsubscribe`
- Requires: number
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "remove_unsubscribe" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write remove_unsubscribe`

##### Rename Contact List
Renames an existing contact list.

- Type: write · Key: `rename_list`
- Requires: list_id, name
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "rename_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write rename_list`

##### Send SMS
Sends an SMS message

- Type: write · Key: `sendSMS`
- Requires: to, sender, message
- Optional: custom_ref, enable_unicode, max_parts, scheduled_for, ignore_unsubscribes
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "sendSMS" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write sendSMS`

##### Send SMS to List
Sends a templated SMS to all contacts in a contact list.

- Type: write · Key: `send_sms_to_list`
- Requires: list_id, sender, message
- Optional: custom_ref, enable_unicode, max_parts, scheduled_for, ignore_unsubscribes
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "send_sms_to_list" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write send_sms_to_list`

##### Update Contact
Updates an existing contact by contact ID.

- Type: write · Key: `update_contact`
- Requires: contact_id
- Optional: number, first_name, last_name, company, other
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "write", action: "update_contact" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 write update_contact`

#### Queries (2)

Queries read from Mobile Message and return data. They change nothing.

##### Find Contact
Finds a contact by phone number.

- Type: search · Key: `find_contact`
- Requires: number
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "search", action: "find_contact" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 search find_contact`

##### Find Message
Finds a sent or scheduled message by message ID or custom reference.

- Type: search · Key: `find_message`
- Requires: message_id
- Optional: custom_ref
- SDK: `runAction({ app: "mobile-message-ca21345", actionType: "search", action: "find_message" })`
- CLI: `npx zapier-sdk run-action mobile-message-ca21345 search find_message`

## Frequently asked questions about automating with Oracle Primavera Cloud and Mobile Message

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Mobile Message integrations: zapier.com/apps/mobile-message-ca21345/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/mobile-message-ca21345
- SDK: npmjs.com/package/@zapier/zapier-sdk