# Oracle Primavera Cloud + Jira Software Cloud Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/jira-software-cloud
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Jira Software Cloud in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_attachment`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "jira-software-cloud", owner: "me" });

const { data } = await zapier.runAction({
  app: "jira-software-cloud",
  actionType: "write",
  action: "add_attachment",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action jira-software-cloud write add_attachment \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Jira Software Cloud

### Identity
Jira Software Cloud is a bug and issue tracking tool that allows software developers to manage product development. This integration connects to cloud-hosted instances of Jira.

- App slug: jira-software-cloud
- Operations published here: 26 (4 events, 11 functions, 10 queries, 1 search-or-write action)

### Authentication
Zapier connects to Jira Software Cloud via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection jira-software-cloud
```

### Capabilities

#### Events (4)

Events fire when something happens in Jira Software Cloud. Use them to start a run.

##### New Issue
Triggers when a new issue is created.

- Type: read · Key: `issue`
- Requires: nothing
- Optional: project, status
- SDK: `runAction({ app: "jira-software-cloud", actionType: "read", action: "issue" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud read issue`

##### New Issue (Via JQL)
Triggers when a new issue is added that matches some JQL.

- Type: read · Key: `issue_jql`
- Requires: nothing
- Optional: jql, order_by
- SDK: `runAction({ app: "jira-software-cloud", actionType: "read", action: "issue_jql" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud read issue_jql`

##### Issue Status Changed
Triggers each time an issue changes status in a project.

- Type: read · Key: `issue_status_change`
- Requires: project
- Optional: status, assignee
- SDK: `runAction({ app: "jira-software-cloud", actionType: "read", action: "issue_status_change" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud read issue_status_change`

##### Updated Issue
Triggers when an existing issue is updated.

- Type: read · Key: `issue_updated`
- Requires: nothing
- Optional: project, status
- SDK: `runAction({ app: "jira-software-cloud", actionType: "read", action: "issue_updated" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud read issue_updated`

#### Functions (11)

Functions change something in Jira Software Cloud.

##### Add Attachment to Issue
Adds an attachment to an issue.

- Type: write · Key: `add_attachment`
- Requires: issueKey, attachment
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_attachment" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_attachment`

##### Add Comment to Issue
Adds a new comment to an issue.

- Type: write · Key: `add_comment`
- Requires: issueKey, comment
- Optional: rich_text_format
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_comment" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_comment`

##### Add or Edit Form on Issue
Add or edit an existing form on an issue and optionally submit it.

- Type: write · Key: `add_edit_form`
- Requires: objectId, formMode, shouldSubmit
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_edit_form" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_edit_form`

##### Link Issues
Creates a link (e.g. "is blocked by") between two issues.

- Type: write · Key: `add_issue_link`
- Requires: firstIssue, linkType, secondIssue
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_issue_link" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_issue_link`

##### Add Watcher to Issue
Adds a new watcher to an issue.

- Type: write · Key: `add_watcher`
- Requires: issueKey
- Optional: user
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_watcher" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_watcher`

##### Add Work Log to Issue
Logs time worked on an issue for time tracking workflows.

- Type: write · Key: `add_worklog`
- Requires: issueKey, timeSpent
- Optional: comment, started
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "add_worklog" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write add_worklog`

##### Create Issue
Creates a new issue.

- Type: write · Key: `create_issue`
- Requires: project, issuetype
- Optional: format_info, rich_text_format
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "create_issue" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write create_issue`

##### Delete Form
Delete a form from a Jira issue.

- Type: write · Key: `delete_form`
- Requires: objectId, formId
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "delete_form" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write delete_form`

##### Move Issue to Sprint
Moves an issue to an active or open sprint.

- Type: write · Key: `move_issue_to_sprint`
- Requires: issueKey, board, sprint
- Optional: project
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "move_issue_to_sprint" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write move_issue_to_sprint`

##### Submit Form
Submit a form that has been filled out on a Jira issue.

- Type: write · Key: `submit_form`
- Requires: objectId, formId
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "submit_form" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write submit_form`

##### Update Issue
Updates an existing issue.

- Type: write · Key: `update_issue`
- Requires: issueKey
- Optional: format_info, transition, rich_text_format
- SDK: `runAction({ app: "jira-software-cloud", actionType: "write", action: "update_issue" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud write update_issue`

#### Queries (10)

Queries read from Jira Software Cloud and return data. They change nothing.

##### Get Attachment Content
Retrieves Jira attachment content by attachment ID.

- Type: search · Key: `attachment`
- Requires: attachment_id
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "attachment" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search attachment`

##### Find Component
Searches for a component by name.

- Type: search · Key: `component`
- Requires: project, name
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "component" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search component`

##### Find Issue
Searches for an issue by summary or key.

- Type: search · Key: `issue`
- Requires: nothing
- Optional: summary, key, fields
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "issue" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search issue`

##### Find Issues by Filter
Executes a saved Jira filter and returns the filtered issues for automated reporting and monitoring workflows.

- Type: search · Key: `issues_by_filter`
- Requires: filter_id
- Optional: max_results, fields
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "issues_by_filter" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search issues_by_filter`

##### Find Issues (Via JQL)
Searches for issues using JQL.

- Type: search · Key: `issue_jql`
- Requires: jql
- Optional: fields, maxResults
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "issue_jql" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search issue_jql`

##### Find Issue by Key
Searches for an issue by key.

- Type: search · Key: `issue_key`
- Requires: nothing
- Optional: key, fields
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "issue_key" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search issue_key`

##### Find Filters
Search for saved Jira filters by name or owner.

- Type: search · Key: `jira_filter`
- Requires: nothing
- Optional: filter_name, owner_name
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "jira_filter" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search jira_filter`

##### Find Project
Searches for a project by name or key.

- Type: search · Key: `project`
- Requires: searchByParameter
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "project" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search project`

##### Get Sprint Information
Retrieves detailed information about a specific sprint including dates, goals, and state.

- Type: search · Key: `sprint`
- Requires: board, sprint
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "sprint" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search sprint`

##### Find User
Finds an existing user.

- Type: search · Key: `user`
- Requires: keyword
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search", action: "user" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search user`

#### Search or Write Actions (1)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Issue
Finds an issue by summary or key. Optionally creates a new issue.

- Type: search_or_write · Key: `issue`
- Requires: project, issuetype
- Optional: summary, key, fields, format_info, rich_text_format
- SDK: `runAction({ app: "jira-software-cloud", actionType: "search_or_write", action: "issue" })`
- CLI: `npx zapier-sdk run-action jira-software-cloud search_or_write issue`

## Frequently asked questions about automating with Oracle Primavera Cloud and Jira Software Cloud

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Jira Software Cloud integrations: zapier.com/apps/jira-software-cloud/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/jira-software-cloud
- SDK: npmjs.com/package/@zapier/zapier-sdk