# Oracle Primavera Cloud + Google Sheets Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/google-sheets
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Google Sheets in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_column`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "google-sheets", owner: "me" });

const { data } = await zapier.runAction({
  app: "google-sheets",
  actionType: "write",
  action: "add_column",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action google-sheets write add_column \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Google Sheets

### Identity
Create, edit, and share spreadsheets wherever you are with Google Sheets, and get automated insights from your data.

- App slug: google-sheets
- Operations published here: 38 (7 events, 20 functions, 8 queries, 3 search-or-write actions)

### Authentication
Zapier connects to Google Sheets via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection google-sheets
```

### Capabilities

#### Events (7)

Events fire when something happens in Google Sheets. Use them to start a run.

##### New Spreadsheet Row (Team Drive)
Triggers when a new row is added to the bottom of a Google Team Drive spreadsheet.

- Type: read · Key: `new_row`
- Requires: spreadsheet, worksheet
- Optional: dont_change_sheet_structure, drive
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "new_row" })`
- CLI: `npx zapier-sdk run-action google-sheets read new_row`

##### New Spreadsheet Row
Triggers when a new row is added to the bottom of a spreadsheet.

- Type: read · Key: `new_row_notify_hook`
- Requires: spreadsheet, worksheet
- Optional: dont_change_sheet_structure, no_team_drive
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "new_row_notify_hook" })`
- CLI: `npx zapier-sdk run-action google-sheets read new_row_notify_hook`

##### New Spreadsheet
Triggers when a new spreadsheet is created.

- Type: read · Key: `spreadsheet`
- Requires: nothing
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "spreadsheet" })`
- CLI: `npx zapier-sdk run-action google-sheets read spreadsheet`

##### New or Updated Spreadsheet Row (Team Drive)
Triggers when a new row is added or an existing row is updated in a spreadsheet. Optimized for Team Drive.

- Type: read · Key: `updated_row`
- Requires: spreadsheet, worksheet
- Optional: dont_change_sheet_structure, drive, dedupe_column
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "updated_row" })`
- CLI: `npx zapier-sdk run-action google-sheets read updated_row`

##### New or Updated Spreadsheet Row
Triggers when a new row is added or modified in a spreadsheet.

- Type: read · Key: `updated_row_notify_hook`
- Requires: spreadsheet, worksheet
- Optional: dont_change_sheet_structure, no_team_drive, dedupe_column
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "updated_row_notify_hook" })`
- CLI: `npx zapier-sdk run-action google-sheets read updated_row_notify_hook`

##### Updated Spreadsheet Row
Triggers when an existing row is updated in a spreadsheet. New rows do not trigger this; use New or Updated Spreadsheet Row for that.

- Type: read · Key: `updated_row_only`
- Requires: spreadsheet, worksheet
- Optional: dont_change_sheet_structure, no_team_drive, dedupe_column
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "updated_row_only" })`
- CLI: `npx zapier-sdk run-action google-sheets read updated_row_only`

##### New Worksheet
Triggers when a worksheet is created in a spreadsheet.

- Type: read · Key: `worksheet`
- Requires: spreadsheet
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "read", action: "worksheet" })`
- CLI: `npx zapier-sdk run-action google-sheets read worksheet`

#### Functions (20)

Functions change something in Google Sheets.

##### Create Spreadsheet Column
Create a new column in a specific spreadsheet.

- Type: write · Key: `add_column`
- Requires: spreadsheet, worksheet, column_name
- Optional: drive, index
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "add_column" })`
- CLI: `npx zapier-sdk run-action google-sheets write add_column`

##### Create Spreadsheet Row
Create a new row in a specific spreadsheet.

- Type: write · Key: `add_row`
- Requires: spreadsheet, worksheet
- Optional: drive, timezone
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "add_row" })`
- CLI: `npx zapier-sdk run-action google-sheets write add_row`

##### Create Multiple Spreadsheet Rows
Create one or more new rows in a specific spreadsheet (with line item support).

- Type: write · Key: `add_row_lines`
- Requires: spreadsheet, worksheet
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "add_row_lines" })`
- CLI: `npx zapier-sdk run-action google-sheets write add_row_lines`

##### Create Spreadsheet Row at Top
Creates a new spreadsheet row at the top of a spreadsheet (after the header row).

- Type: write · Key: `add_row_top`
- Requires: spreadsheet, worksheet
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "add_row_top" })`
- CLI: `npx zapier-sdk run-action google-sheets write add_row_top`

##### Change Sheet Properties
Update Google Sheets properties like frozen rows/columns, sheet position, and visibility settings.

- Type: write · Key: `change_sheet_properties`
- Requires: spreadsheet, worksheet
- Optional: drive, frozen_rows, frozen_columns, sheet_position, hidden
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "change_sheet_properties" })`
- CLI: `npx zapier-sdk run-action google-sheets write change_sheet_properties`

##### Create Conditional Formatting Rule
Apply conditional formatting to cells in a Google Sheets spreadsheet based on their values.

- Type: write · Key: `conditional_format`
- Requires: spreadsheet, worksheet, range, condition_type
- Optional: drive, background_color, text_color, text_format_bold, text_format_italic
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "conditional_format" })`
- CLI: `npx zapier-sdk run-action google-sheets write conditional_format`

##### Copy Range
Copy data from one range to another within a Google Sheets spreadsheet, with options for what to paste (values, formatting, etc.).

- Type: write · Key: `copy_range`
- Requires: spreadsheet, worksheet, source_range, destination_range
- Optional: drive, paste_type
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "copy_range" })`
- CLI: `npx zapier-sdk run-action google-sheets write copy_range`

##### Copy Worksheet
Creates a new worksheet by copying an existing worksheet.

- Type: write · Key: `copy_worksheet`
- Requires: spreadsheet, worksheet
- Optional: drive, copy_to
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "copy_worksheet" })`
- CLI: `npx zapier-sdk run-action google-sheets write copy_worksheet`

##### Create Spreadsheet
Creates a new spreadsheet. Choose from a blank spreadsheet, a copy of an existing one, or one with headers.

- Type: write · Key: `create_spreadsheet`
- Requires: title
- Optional: drive, spreadsheet_to_copy, headers
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "create_spreadsheet" })`
- CLI: `npx zapier-sdk run-action google-sheets write create_spreadsheet`

##### Create Worksheet
Creates a new worksheet in a Google Sheet.

- Type: write · Key: `create_worksheet`
- Requires: spreadsheet, title
- Optional: drive, overwrite, headers
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "create_worksheet" })`
- CLI: `npx zapier-sdk run-action google-sheets write create_worksheet`

##### Clear Spreadsheet Row(s)
Clears the contents of the selected row(s) while keeping the row(s) intact in the spreadsheet.

- Type: write · Key: `delete_row`
- Requires: spreadsheet, worksheet, row
- Optional: info, drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "delete_row" })`
- CLI: `npx zapier-sdk run-action google-sheets write delete_row`

##### Delete Sheet
Permanently delete a worksheet from a Google Sheets spreadsheet. Warning: This action cannot be undone.

- Type: write · Key: `delete_sheet`
- Requires: spreadsheet, worksheet, confirmation
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "delete_sheet" })`
- CLI: `npx zapier-sdk run-action google-sheets write delete_sheet`

##### Delete Spreadsheet Row(s)
Deletes the selected row(s) from the spreadsheet. This action removes the row(s) and all associated data.

- Type: write · Key: `delete_spreadsheet_row`
- Requires: spreadsheet, worksheet, rows
- Optional: info, drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "delete_spreadsheet_row" })`
- CLI: `npx zapier-sdk run-action google-sheets write delete_spreadsheet_row`

##### Format Cell Range
Apply date, number, or style formatting (colors, bold, italic, strikethrough) to a range of cells in a Google Sheets spreadsheet.

- Type: write · Key: `format_cell_range`
- Requires: spreadsheet, worksheet, range, format_type
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "format_cell_range" })`
- CLI: `npx zapier-sdk run-action google-sheets write format_cell_range`

##### Format Spreadsheet Row
Format a row in a specific spreadsheet.

- Type: write · Key: `format_row`
- Requires: spreadsheet, worksheet, row
- Optional: drive, background_color, text_color, text_format_bold, text_format_italic, text_format_strikethrough
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "format_row" })`
- CLI: `npx zapier-sdk run-action google-sheets write format_row`

##### Rename Sheet
Rename a worksheet in a Google Sheets spreadsheet.

- Type: write · Key: `rename_sheet`
- Requires: spreadsheet, worksheet, new_name
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "rename_sheet" })`
- CLI: `npx zapier-sdk run-action google-sheets write rename_sheet`

##### Set Data Validation
Set data validation rules on a range of cells in Google Sheets to control what data can be entered.

- Type: write · Key: `set_data_validation`
- Requires: spreadsheet, worksheet, range, validation_type
- Optional: drive, input_message, strict
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "set_data_validation" })`
- CLI: `npx zapier-sdk run-action google-sheets write set_data_validation`

##### Sort Range
Sort data within a specified range in Google Sheets by a chosen column in ascending or descending order.

- Type: write · Key: `sort_range`
- Requires: spreadsheet, worksheet, range, sort_column, sort_order
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "sort_range" })`
- CLI: `npx zapier-sdk run-action google-sheets write sort_range`

##### Update Spreadsheet Row
Update a row in a specific spreadsheet with optional formatting.

- Type: write · Key: `update_row`
- Requires: spreadsheet, worksheet, row
- Optional: drive, force_all_fields, background_color, text_color, text_format_bold, text_format_italic, text_format_strikethrough
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "update_row" })`
- CLI: `npx zapier-sdk run-action google-sheets write update_row`

##### Update Spreadsheet Row(s)
Update one or more rows in a specific spreadsheet (with line item support).

- Type: write · Key: `update_row_lines`
- Requires: spreadsheet, worksheet
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "write", action: "update_row_lines" })`
- CLI: `npx zapier-sdk run-action google-sheets write update_row_lines`

#### Queries (8)

Queries read from Google Sheets and return data. They change nothing.

##### Lookup Spreadsheet Rows (Advanced)
Find up to 500 rows based on a column and value as line items.

- Type: search · Key: `find_many_rows`
- Requires: spreadsheet, worksheet, lookup_key, lookup_value
- Optional: drive, lookup_key_support, lookup_value_support, bottom_up, first_row, row_count
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "find_many_rows" })`
- CLI: `npx zapier-sdk run-action google-sheets search find_many_rows`

##### Find Spreadsheet
Finds a spreadsheet by name.

- Type: search · Key: `find_spreadsheet`
- Requires: title
- Optional: drive, search_type
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "find_spreadsheet" })`
- CLI: `npx zapier-sdk run-action google-sheets search find_spreadsheet`

##### Find Worksheet
Finds a worksheet by title.

- Type: search · Key: `find_worksheet`
- Requires: spreadsheet, title
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "find_worksheet" })`
- CLI: `npx zapier-sdk run-action google-sheets search find_worksheet`

##### Get Data Range
Get data from a specific range in a Google Spreadsheet using A1 notation (e.g., "A1:D10", "B2:E5").

- Type: search · Key: `get_data_range`
- Requires: spreadsheet, worksheet, a1_range
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "get_data_range" })`
- CLI: `npx zapier-sdk run-action google-sheets search get_data_range`

##### Get Many Spreadsheet Rows (Advanced)
Return up to 1,500 rows as a single JSON value or as line items.

- Type: search · Key: `get_many_rows`
- Requires: spreadsheet, worksheet, range, row_count
- Optional: drive, output_format, first_row
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "get_many_rows" })`
- CLI: `npx zapier-sdk run-action google-sheets search get_many_rows`

##### Get Row by ID
Get a specific spreadsheet row by its row number (ID). Row 1 is typically the header row.

- Type: search · Key: `get_row_by_id`
- Requires: spreadsheet, worksheet, row_id
- Optional: drive
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "get_row_by_id" })`
- CLI: `npx zapier-sdk run-action google-sheets search get_row_by_id`

##### Get Spreadsheet by ID
Get a specific Google Spreadsheet by its ID. Returns the raw spreadsheet data from the Google Sheets API.

- Type: search · Key: `get_spreadsheet_by_id`
- Requires: spreadsheet
- Optional: includeGridData
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "get_spreadsheet_by_id" })`
- CLI: `npx zapier-sdk run-action google-sheets search get_spreadsheet_by_id`

##### Lookup Spreadsheet Row
Find a specific spreadsheet row based on a column and value. If found, it returns the entire row.

- Type: search · Key: `lookup_row`
- Requires: spreadsheet, worksheet, lookup_key, lookup_value
- Optional: drive, lookup_key_support, lookup_value_support, bottom_up, row_count
- SDK: `runAction({ app: "google-sheets", actionType: "search", action: "lookup_row" })`
- CLI: `npx zapier-sdk run-action google-sheets search lookup_row`

#### Search or Write Actions (3)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Spreadsheet
Finds a spreadsheet by name, or creates one if none is found.

- Type: search_or_write · Key: `find_spreadsheet`
- Requires: title
- Optional: drive, search_type, spreadsheet_to_copy, headers
- SDK: `runAction({ app: "google-sheets", actionType: "search_or_write", action: "find_spreadsheet" })`
- CLI: `npx zapier-sdk run-action google-sheets search_or_write find_spreadsheet`

##### Find or Create Worksheet
Finds or creates a specific find worksheet.

- Type: search_or_write · Key: `find_worksheet`
- Requires: spreadsheet, title
- Optional: drive, overwrite, headers
- SDK: `runAction({ app: "google-sheets", actionType: "search_or_write", action: "find_worksheet" })`
- CLI: `npx zapier-sdk run-action google-sheets search_or_write find_worksheet`

##### Find or Create Row
Finds or creates a specific lookup row.

- Type: search_or_write · Key: `lookup_row`
- Requires: spreadsheet, worksheet, lookup_key, lookup_value
- Optional: drive, lookup_key_support, lookup_value_support, bottom_up, row_count
- SDK: `runAction({ app: "google-sheets", actionType: "search_or_write", action: "lookup_row" })`
- CLI: `npx zapier-sdk run-action google-sheets search_or_write lookup_row`

## Frequently asked questions about automating with Oracle Primavera Cloud and Google Sheets

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Google Sheets integrations: zapier.com/apps/google-sheets/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/google-sheets
- SDK: npmjs.com/package/@zapier/zapier-sdk