# Oracle Primavera Cloud + Microsoft Excel Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/excel
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Microsoft Excel in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_row`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "excel", owner: "me" });

const { data } = await zapier.runAction({
  app: "excel",
  actionType: "write",
  action: "add_row",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action excel write add_row \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Microsoft Excel

### Identity
Microsoft's Excel is a spreadsheet application used by millions of users across the world. It is part of the Office ecosystem and is considered the industry standard for spreadsheets. 

Only files on OneDrive for Business (available with Office 365 and Sharepoint server) are supported at this time with Zapier.

- App slug: excel
- Operations published here: 23 (4 events, 12 functions, 5 queries, 2 search-or-write actions)

### Authentication
Zapier connects to Microsoft Excel via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection excel
```

### Capabilities

#### Events (4)

Events fire when something happens in Microsoft Excel. Use them to start a run.

##### New Row
Triggers when a new row is added to a worksheet in a spreadsheet.

- Type: read · Key: `new_row`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "read", action: "new_row" })`
- CLI: `npx zapier-sdk run-action excel read new_row`

##### New Row in Table
Triggers when a new row is added to a table in a spreadsheet.

- Type: read · Key: `new_table_row`
- Requires: workbook_id, worksheet_id, table_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "read", action: "new_table_row" })`
- CLI: `npx zapier-sdk run-action excel read new_table_row`

##### New Worksheet
Triggers when a new worksheet is added to a spreadsheet.

- Type: read · Key: `new_worksheet`
- Requires: workbook_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "read", action: "new_worksheet" })`
- CLI: `npx zapier-sdk run-action excel read new_worksheet`

##### Updated Row
Triggers when a row is added or updated in a worksheet.

- Type: read · Key: `updated_row`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, dedupe_column
- SDK: `runAction({ app: "excel", actionType: "read", action: "updated_row" })`
- CLI: `npx zapier-sdk run-action excel read updated_row`

#### Functions (12)

Functions change something in Microsoft Excel.

##### Add Row
Adds a new row to the end of a worksheet.

- Type: write · Key: `add_row`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "add_row" })`
- CLI: `npx zapier-sdk run-action excel write add_row`

##### Add Row(s)
Adds one or more rows to the end of a worksheet (with line item support).

- Type: write · Key: `add_rows_v2`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "add_rows_v2" })`
- CLI: `npx zapier-sdk run-action excel write add_rows_v2`

##### Add Row to Table
Adds a new row to the end of a specific table.

- Type: write · Key: `add_table_row`
- Requires: workbook_id, worksheet_id, table_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "add_table_row" })`
- CLI: `npx zapier-sdk run-action excel write add_table_row`

##### Clear Cells by Range
Clears the contents and/or formatting of a range of cells.

- Type: write · Key: `clear_cells_by_range`
- Requires: workbook_id, worksheet_id, range
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, applyTo
- SDK: `runAction({ app: "excel", actionType: "write", action: "clear_cells_by_range" })`
- CLI: `npx zapier-sdk run-action excel write clear_cells_by_range`

##### Clear Column by Index
Clears the contents and/or formatting of a column by index.

- Type: write · Key: `clear_column_by_index`
- Requires: workbook_id, worksheet_id, column_index
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, applyTo, header_preservation
- SDK: `runAction({ app: "excel", actionType: "write", action: "clear_column_by_index" })`
- CLI: `npx zapier-sdk run-action excel write clear_column_by_index`

##### Clear Row by ID
Clears the contents and/or formatting of a row by ID.

- Type: write · Key: `clear_row_by_id`
- Requires: workbook_id, worksheet_id, row_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, applyTo
- SDK: `runAction({ app: "excel", actionType: "write", action: "clear_row_by_id" })`
- CLI: `npx zapier-sdk run-action excel write clear_row_by_id`

##### Create Workbook
Creates a new workbook

- Type: write · Key: `create_workbook`
- Requires: title
- Optional: plan_restrictions, storage_source, folder_id, headers, zap_step_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "create_workbook" })`
- CLI: `npx zapier-sdk run-action excel write create_workbook`

##### Create Worksheet
Creates a new worksheet in an existing workbook

- Type: write · Key: `create_worksheet`
- Requires: workbook_id, name
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, headers
- SDK: `runAction({ app: "excel", actionType: "write", action: "create_worksheet" })`
- CLI: `npx zapier-sdk run-action excel write create_worksheet`

##### Delete Spreadsheet Row by ID
Deletes a spreadsheet row and shifts the remaining rows upwards.

- Type: write · Key: `delete_row_by_id`
- Requires: workbook_id, worksheet_id, row_id, confirmation
- Optional: plan_restrictions, shared_workbook_note, caution_copy, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "delete_row_by_id" })`
- CLI: `npx zapier-sdk run-action excel write delete_row_by_id`

##### Delete Worksheet
Deletes a worksheet.

- Type: write · Key: `delete_worksheet`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "delete_worksheet" })`
- CLI: `npx zapier-sdk run-action excel write delete_worksheet`

##### Rename Worksheet
Renames a worksheet.

- Type: write · Key: `rename_worksheet`
- Requires: workbook_id, worksheet_id, name
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "rename_worksheet" })`
- CLI: `npx zapier-sdk run-action excel write rename_worksheet`

##### Update Row
Updates a row in a specific worksheet.

- Type: write · Key: `update_row`
- Requires: workbook_id, worksheet_id, row_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "write", action: "update_row" })`
- CLI: `npx zapier-sdk run-action excel write update_row`

#### Queries (5)

Queries read from Microsoft Excel and return data. They change nothing.

##### Find Row
Finds a row that matches a column and value.

- Type: search · Key: `find_row`
- Requires: workbook_id, worksheet_id, lookup_key, lookup_value
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "search", action: "find_row" })`
- CLI: `npx zapier-sdk run-action excel search find_row`

##### Find Worksheet(s)
Finds worksheet(s) by name.

- Type: search · Key: `find_worksheet`
- Requires: workbook_id, name
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "search", action: "find_worksheet" })`
- CLI: `npx zapier-sdk run-action excel search find_worksheet`

##### Get Cells in Range
Returns the contents of a range of cells.

- Type: search · Key: `get_cells_in_range`
- Requires: workbook_id, worksheet_id, range
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "search", action: "get_cells_in_range" })`
- CLI: `npx zapier-sdk run-action excel search get_cells_in_range`

##### Get Row by ID
Returns the contents of a Row based on its ID.

- Type: search · Key: `get_row`
- Requires: workbook_id, worksheet_id, row_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, no_match_copy
- SDK: `runAction({ app: "excel", actionType: "search", action: "get_row" })`
- CLI: `npx zapier-sdk run-action excel search get_row`

##### Get Worksheet by ID
Returns a Worksheet metadata based on its ID.

- Type: search · Key: `get_worksheet`
- Requires: workbook_id, worksheet_id
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "search", action: "get_worksheet" })`
- CLI: `npx zapier-sdk run-action excel search get_worksheet`

#### Search or Write Actions (2)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Row
Finds a row, or creates one if none is found.

- Type: search_or_write · Key: `find_row`
- Requires: workbook_id, worksheet_id, lookup_key, lookup_value
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id
- SDK: `runAction({ app: "excel", actionType: "search_or_write", action: "find_row" })`
- CLI: `npx zapier-sdk run-action excel search_or_write find_row`

##### Find or Create Worksheet
Finds or creates a worksheet by name.

- Type: search_or_write · Key: `find_worksheet`
- Requires: workbook_id, name
- Optional: plan_restrictions, shared_workbook_note, storage_source, folder_id, headers
- SDK: `runAction({ app: "excel", actionType: "search_or_write", action: "find_worksheet" })`
- CLI: `npx zapier-sdk run-action excel search_or_write find_worksheet`

## Frequently asked questions about automating with Oracle Primavera Cloud and Microsoft Excel

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Microsoft Excel integrations: zapier.com/apps/excel/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/excel
- SDK: npmjs.com/package/@zapier/zapier-sdk