# Oracle Primavera Cloud + ChatGPT (OpenAI) Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/chatgpt
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and ChatGPT (OpenAI) in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · analyze_images_responses_api`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "chatgpt", owner: "me" });

const { data } = await zapier.runAction({
  app: "chatgpt",
  actionType: "write",
  action: "analyze_images_responses_api",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action chatgpt write analyze_images_responses_api \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## ChatGPT (OpenAI)

### Identity
ChatGPT is an AI tool built by OpenAI that enables conversational automation.

- App slug: chatgpt
- Operations published here: 27 (21 functions, 5 queries, 1 search-or-write action)

### Authentication
Zapier connects to ChatGPT (OpenAI) via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection chatgpt
```

### Capabilities

#### Functions (21)

Functions change something in ChatGPT (OpenAI).

##### Analyze Images
(Recommended) Upload an image(s) and send a message or question about it. Powered by Responses API.

- Type: write · Key: `analyze_images_responses_api`
- Requires: images
- Optional: user_message, max_tokens
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "analyze_images_responses_api" })`
- CLI: `npx zapier-sdk run-action chatgpt write analyze_images_responses_api`

##### Analyze Image Content With Vision (Legacy)
Upload an image and send a message or question about it. Powered by Chat Completions API.

- Type: write · Key: `analyze_image_content_with_vision`
- Requires: images
- Optional: user_message, max_tokens
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "analyze_image_content_with_vision" })`
- CLI: `npx zapier-sdk run-action chatgpt write analyze_image_content_with_vision`

##### Analyze Text
(Recommended) Summarize, classify, and analyze text. Powered by Responses API.

- Type: write · Key: `analyze_text_responses_api`
- Requires: text_to_analyze, model, analysis_type
- Optional: info_1
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "analyze_text_responses_api" })`
- CLI: `npx zapier-sdk run-action chatgpt write analyze_text_responses_api`

##### Analyze Text Sentiment (Legacy)
Generate an analysis of the overall sentiment of a block of text. Powered by Chat Completions API.

- Type: write · Key: `analyze_text_sentiment`
- Requires: text_to_analyze, model
- Optional: info_1, max_tokens, temperature
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "analyze_text_sentiment" })`
- CLI: `npx zapier-sdk run-action chatgpt write analyze_text_sentiment`

##### Ask Questions (Beta)
Asks yes or no, pick one, or scale questions about text or images, and returns each answer with a confidence score. Powered by the Decisions API (beta).

- Type: write · Key: `ask_questions`
- Requires: nothing
- Optional: beta_info, content, images, yes_no_questions, pick_one_name, pick_one_question, pick_one_options, scale_name, scale_question, scale_levels, min_confidence, when_unsure
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "ask_questions" })`
- CLI: `npx zapier-sdk run-action chatgpt write ask_questions`

##### Conversation (Legacy)
Sends a Chat to OpenAI and generates a Completion, optionally storing messages as we do. Powered by Chat Completions API.

- Type: write · Key: `chat_completion_memory`
- Requires: user_message, model
- Optional: use_latest_stable_model, memory_key, user_name, assistant_name, system_message, max_tokens, temperature, top_p, info_2
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "chat_completion_memory" })`
- CLI: `npx zapier-sdk run-action chatgpt write chat_completion_memory`

##### Check Moderations
Classifies if text is potentially harmful.

- Type: write · Key: `check_moderations`
- Requires: model
- Optional: copy, text_to_classify, images
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "check_moderations" })`
- CLI: `npx zapier-sdk run-action chatgpt write check_moderations`

##### Classify Text (Legacy)
Classify your text into one of your provided categories. Powered by Chat Completions API.

- Type: write · Key: `classify_text`
- Requires: text_to_classify, categories, model
- Optional: max_tokens, temperature, top_p
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "classify_text" })`
- CLI: `npx zapier-sdk run-action chatgpt write classify_text`

##### Conversation
(Recommended) Send a chat to OpenAI, optionally storing messages for continuous conversation. This enhanced action can also help with web search, file search, and advanced tooling such as MCP. Powered by Responses API.

- Type: write · Key: `conversation_responses_api`
- Requires: model, user_message
- Optional: instructions, info_2, use_prompt_template, images, file_clarification, files, max_tokens, tool_choice, parallel_tool_calls, max_tool_calls, tools, response_format, advanced_warning, memory_key, prompt_cache_key, safety_identifier, metadata
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "conversation_responses_api" })`
- CLI: `npx zapier-sdk run-action chatgpt write conversation_responses_api`

##### Create Embedding
Generate vector embeddings for text input.

- Type: write · Key: `create_embedding`
- Requires: input
- Optional: model, dimensions, encoding_format
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "create_embedding" })`
- CLI: `npx zapier-sdk run-action chatgpt write create_embedding`

##### Create Image Edit
Creates a new image by editing an existing image with a prompt.

- Type: write · Key: `create_image_edit`
- Requires: image, prompt
- Optional: mask, model, user
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "create_image_edit" })`
- CLI: `npx zapier-sdk run-action chatgpt write create_image_edit`

##### Create Transcription
Creates a new transcription, using Whisper, from an audio or video file.

- Type: write · Key: `create_transcription`
- Requires: file
- Optional: prompt, response_format, timestamp_granularities, language, temperature
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "create_transcription" })`
- CLI: `npx zapier-sdk run-action chatgpt write create_transcription`

##### Create Video
Create a new video generation job using Sora. Returns a video job ID that can be used to check the render status.

- Type: write · Key: `create_video`
- Requires: prompt
- Optional: model, seconds, size
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "create_video" })`
- CLI: `npx zapier-sdk run-action chatgpt write create_video`

##### Extract Structured Data (Legacy)
Sends unstructured text and returns structured data using OpenAI's "Function Calling" capability. Powered by Chat Completions API.

- Type: write · Key: `extract_structured_data`
- Requires: prompt, model, description, arguments
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "extract_structured_data" })`
- CLI: `npx zapier-sdk run-action chatgpt write extract_structured_data`

##### Extract Structured Data
(Recommended) Improved structured data extraction with better formatting options and more reliable schema adherence. Powered by Responses API.

- Type: write · Key: `extract_structured_data_responses_api`
- Requires: prompt, model, description, arguments
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "extract_structured_data_responses_api" })`
- CLI: `npx zapier-sdk run-action chatgpt write extract_structured_data_responses_api`

##### Generate An Image
Generates an image using a relevant OpenAI model.

- Type: write · Key: `generate_image`
- Requires: prompt
- Optional: model, user
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "generate_image" })`
- CLI: `npx zapier-sdk run-action chatgpt write generate_image`

##### Send Prompt
Sends a prompt to OpenAI and generates a completion.  Note:  this uses the legacy OpenAI Completions API. We recommend using  Conversation  or  Conversation With Assistant  actions instead, which are powered by the latest OpenAI APIs.

- Type: write · Key: `send_prompt`
- Requires: model, prompt
- Optional: info_1, info_2, temperature, max_tokens, stop, top_p, frequency_penalty, presence_penalty
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "send_prompt" })`
- CLI: `npx zapier-sdk run-action chatgpt write send_prompt`

##### Summarize Text (Legacy)
Enter a block of text and generate a summary. Powered by Chat Completions API.

- Type: write · Key: `summarize_text`
- Requires: text_to_summarize, model
- Optional: max_tokens, temperature, top_p
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "summarize_text" })`
- CLI: `npx zapier-sdk run-action chatgpt write summarize_text`

##### Convert Text to Speech
Converts a given text to speech.

- Type: write · Key: `text_to_speech`
- Requires: model, input, voice
- Optional: info_1, info_2, response_format, speed
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "text_to_speech" })`
- CLI: `npx zapier-sdk run-action chatgpt write text_to_speech`

##### Create Translation
Creates a new translation.

- Type: write · Key: `translation`
- Requires: file
- Optional: prompt, response_format, temperature
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "translation" })`
- CLI: `npx zapier-sdk run-action chatgpt write translation`

##### Write an Email
Writes the content of an email based on your provided prompt for use in a subsequent step.

- Type: write · Key: `write_email`
- Requires: name, email, from, prompt, tone, type, model
- Optional: info_3, max_tokens, temperature, top_p
- SDK: `runAction({ app: "chatgpt", actionType: "write", action: "write_email" })`
- CLI: `npx zapier-sdk run-action chatgpt write write_email`

#### Queries (5)

Queries read from ChatGPT (OpenAI) and return data. They change nothing.

##### Find Conversation
Find a conversation for native OpenAI conversation management.

- Type: search · Key: `find_conversation`
- Requires: conversation_id
- SDK: `runAction({ app: "chatgpt", actionType: "search", action: "find_conversation" })`
- CLI: `npx zapier-sdk run-action chatgpt search find_conversation`

##### Find File
Finds a file by filename.

- Type: search · Key: `find_file`
- Requires: filename_to_search_for
- Optional: file_purpose_to_search_for
- SDK: `runAction({ app: "chatgpt", actionType: "search", action: "find_file" })`
- CLI: `npx zapier-sdk run-action chatgpt search find_file`

##### Find Response
Find a stored Responses API result by response ID for audit trails and debugging.

- Type: search · Key: `find_response`
- Requires: response_id
- SDK: `runAction({ app: "chatgpt", actionType: "search", action: "find_response" })`
- CLI: `npx zapier-sdk run-action chatgpt search find_response`

##### Get Video
Retrieve the status and details of a video generation job created with Sora. Use this to check if a video is ready for download.

- Type: search · Key: `get_video`
- Requires: video_id
- SDK: `runAction({ app: "chatgpt", actionType: "search", action: "get_video" })`
- CLI: `npx zapier-sdk run-action chatgpt search get_video`

##### Search Embeddings
This best matches a query string (like "big animal") to a list of document strings (like "mouse", "cat", "buffalo", and "blue whale").

- Type: search · Key: `search_embeddings_v2`
- Requires: query, documents
- SDK: `runAction({ app: "chatgpt", actionType: "search", action: "search_embeddings_v2" })`
- CLI: `npx zapier-sdk run-action chatgpt search search_embeddings_v2`

#### Search or Write Actions (1)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create File
Find or Create file

- Type: search_or_write · Key: `find_file`
- Requires: filename_to_search_for, file
- Optional: file_purpose_to_search_for, purpose
- SDK: `runAction({ app: "chatgpt", actionType: "search_or_write", action: "find_file" })`
- CLI: `npx zapier-sdk run-action chatgpt search_or_write find_file`

## Frequently asked questions about automating with Oracle Primavera Cloud and ChatGPT (OpenAI)

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- ChatGPT (OpenAI) integrations: zapier.com/apps/chatgpt/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/chatgpt
- SDK: npmjs.com/package/@zapier/zapier-sdk