# Oracle Primavera Cloud + Assignar Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/assignar
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Assignar in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · create_activity`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "assignar", owner: "me" });

const { data } = await zapier.runAction({
  app: "assignar",
  actionType: "write",
  action: "create_activity",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action assignar write create_activity \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Assignar

### Identity
Assignar is a workforce and asset management platform for construction sub contractor and self-perform general contractors.

- App slug: assignar
- Operations published here: 94 (19 events, 34 functions, 28 queries, 13 search-or-write actions)

### Authentication
Zapier connects to Assignar via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection assignar
```

### Capabilities

#### Events (19)

Events fire when something happens in Assignar. Use them to start a run.

##### New Task
Triggers when a new Task is created.

- Type: read · Key: `find_tasks`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "find_tasks" })`
- CLI: `npx zapier-sdk run-action assignar read find_tasks`

##### New Timesheet
Triggers when a new Timesheet is created.

- Type: read · Key: `find_timesheets`
- Requires: approved_filter
- SDK: `runAction({ app: "assignar", actionType: "read", action: "find_timesheets" })`
- CLI: `npx zapier-sdk run-action assignar read find_timesheets`

##### New Timesheets Raw
Triggers when a new timesheet is created.

- Type: read · Key: `find_timesheets_raw`
- Requires: approved_filter
- SDK: `runAction({ app: "assignar", actionType: "read", action: "find_timesheets_raw" })`
- CLI: `npx zapier-sdk run-action assignar read find_timesheets_raw`

##### New Activity
Triggers when a new Activity is created.

- Type: read · Key: `new_activity`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_activity" })`
- CLI: `npx zapier-sdk run-action assignar read new_activity`

##### New Asset
Triggers when a new Asset is created.

- Type: read · Key: `new_asset`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_asset" })`
- CLI: `npx zapier-sdk run-action assignar read new_asset`

##### New Charge Code
Triggers when a new Charge Code is created.

- Type: read · Key: `new_charge_code`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_charge_code" })`
- CLI: `npx zapier-sdk run-action assignar read new_charge_code`

##### New Client
Triggers when a new Client is created.

- Type: read · Key: `new_client`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_client" })`
- CLI: `npx zapier-sdk run-action assignar read new_client`

##### New Contact
Triggers when a new Contanct is created.

- Type: read · Key: `new_contact`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_contact" })`
- CLI: `npx zapier-sdk run-action assignar read new_contact`

##### New Digital Docket
Triggers when a new digital docket is created.

- Type: read · Key: `new_digital_docket`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_digital_docket" })`
- CLI: `npx zapier-sdk run-action assignar read new_digital_docket`

##### New Order
Triggers when a new Order is created.

- Type: read · Key: `new_order`
- Requires: nothing
- Optional: status
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_order" })`
- CLI: `npx zapier-sdk run-action assignar read new_order`

##### New Order Task
When an Task is associated with an Order.

- Type: read · Key: `new_order_task`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_order_task" })`
- CLI: `npx zapier-sdk run-action assignar read new_order_task`

##### New Project
Triggers when a new Project is created.

- Type: read · Key: `new_project`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_project" })`
- CLI: `npx zapier-sdk run-action assignar read new_project`

##### New Site Diary
Triggers when a new Site Diary is created.

- Type: read · Key: `new_site_diary`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_site_diary" })`
- CLI: `npx zapier-sdk run-action assignar read new_site_diary`

##### New Skill
Triggers when a new skill is created.

- Type: read · Key: `new_skill`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_skill" })`
- CLI: `npx zapier-sdk run-action assignar read new_skill`

##### New Supplier
Triggers when a new Supplier is created.

- Type: read · Key: `new_supplier`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_supplier" })`
- CLI: `npx zapier-sdk run-action assignar read new_supplier`

##### New User
Triggers when a new User is created.

- Type: read · Key: `new_user`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "new_user" })`
- CLI: `npx zapier-sdk run-action assignar read new_user`

##### Updated User
Triggers when a new User is updated.

- Type: read · Key: `updated_user`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "updated_user" })`
- CLI: `npx zapier-sdk run-action assignar read updated_user`

##### Updated Order
Triggers when any attribute in Order is updated.

- Type: read · Key: `update_order`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "update_order" })`
- CLI: `npx zapier-sdk run-action assignar read update_order`

##### Updated Project
Triggers when any attribute of project is updated.

- Type: read · Key: `update_project`
- Requires: nothing
- SDK: `runAction({ app: "assignar", actionType: "read", action: "update_project" })`
- CLI: `npx zapier-sdk run-action assignar read update_project`

#### Functions (34)

Functions change something in Assignar.

##### Create Activity
Creates an Activity.

- Type: write · Key: `create_activity`
- Requires: activity_name
- Optional: external_identifier, integration_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_activity" })`
- CLI: `npx zapier-sdk run-action assignar write create_activity`

##### Create Asset
Creates an Asset.

- Type: write · Key: `create_asset`
- Requires: name
- Optional: external_identifier, integration_id, description, rego_number, year, make, model, serial_number, charge_rate, number_reading, tag_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_asset" })`
- CLI: `npx zapier-sdk run-action assignar write create_asset`

##### Create Charge Code
Creates a Charge Code.

- Type: write · Key: `create_charge_code`
- Requires: code
- Optional: label, integration_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_charge_code" })`
- CLI: `npx zapier-sdk run-action assignar write create_charge_code`

##### Create Client
Creates a Client

- Type: write · Key: `create_client`
- Requires: name, is_active
- Optional: external_identifier, integration_id, abn, email, office_phone, mobile, address_1, address_2, city, postcode, state, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_client" })`
- CLI: `npx zapier-sdk run-action assignar write create_client`

##### Create Competency
Creates a Competency

- Type: write · Key: `create_competency`
- Requires: name
- Optional: exp_req, issue_req
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_competency" })`
- CLI: `npx zapier-sdk run-action assignar write create_competency`

##### Create Contact
Creates a Contact.

- Type: write · Key: `create_contact`
- Requires: first_name, last_name
- Optional: external_id, company, office_phone, mobile, email, job_title, address_1, address_2, city, state, postcode, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_contact" })`
- CLI: `npx zapier-sdk run-action assignar write create_contact`

##### Create Induction
Creates an Induction

- Type: write · Key: `create_induction`
- Requires: name
- Optional: exp_req, issue_req
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_induction" })`
- CLI: `npx zapier-sdk run-action assignar write create_induction`

##### Create Journal
Creates a Journal entry in Assignar against a chosen object.

- Type: write · Key: `create_journal`
- Requires: journal_type, visible_in_app, comment, identifier
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_journal" })`
- CLI: `npx zapier-sdk run-action assignar write create_journal`

##### Create Order
Creates an Order

- Type: write · Key: `create_order`
- Requires: active, client_id, start_date, end_date, order_status
- Optional: project_id, job_description, location, location2, job_number, integration_id, po_number, supplier_id, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_order" })`
- CLI: `npx zapier-sdk run-action assignar write create_order`

##### Create Order Task
Creates a Task for a specific Work Order. This typically works best as an action immediately after Create Order is completed.

- Type: write · Key: `create_order_task`
- Requires: order, task
- Optional: task_quantity, description
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_order_task" })`
- CLI: `npx zapier-sdk run-action assignar write create_order_task`

##### Create Project
Creates a Project.

- Type: write · Key: `create_project`
- Requires: project_name, client, is_active
- Optional: project_external_identifier, integration_id, address, suburb, postcode, state, parent_id, tag_id, activity_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_project" })`
- CLI: `npx zapier-sdk run-action assignar write create_project`

##### Create Relational Contact
Creates a contact and Associates it with a Client or Project

- Type: write · Key: `create_relational_contact`
- Requires: contact
- Optional: client, project
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_relational_contact" })`
- CLI: `npx zapier-sdk run-action assignar write create_relational_contact`

##### Create Supplier
Creates a new Supplier.

- Type: write · Key: `create_supplier`
- Requires: name
- Optional: external_id, abn, email, office_phone, mobile, address_1, address_2, city, postcode, state, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_supplier" })`
- CLI: `npx zapier-sdk run-action assignar write create_supplier`

##### Create Task
Creates a Task.

- Type: write · Key: `create_task`
- Requires: name, is_active
- Optional: integration_id, external_identifier, req_machines
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_task" })`
- CLI: `npx zapier-sdk run-action assignar write create_task`

##### Create Timesheet
Creates a Timesheet

- Type: write · Key: `create_timesheet`
- Requires: date_of_creation, user_id, client_id, task_id, start_time, end_time, break_time, total_time, submitted_date, activity_id, activity_start_time, activity_end_time
- Optional: integration_id, project_id, travel_time_to, travel_time_from, comments, asset_id, checked, locked
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_timesheet" })`
- CLI: `npx zapier-sdk run-action assignar write create_timesheet`

##### Create User
Creates a User.

- Type: write · Key: `create_user`
- Requires: user_type_id, first_name, last_name, employment_type, username, password, retype_password
- Optional: employee_identifier, integration_id, email, contact, address, suburb, state, postcode, dob, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_user" })`
- CLI: `npx zapier-sdk run-action assignar write create_user`

##### Create User Competency
Associates an existing Assignar Competency with a User.

- Type: write · Key: `create_user_competency`
- Requires: user, competency
- Optional: description, expiry_time, issue_date
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_user_competency" })`
- CLI: `npx zapier-sdk run-action assignar write create_user_competency`

##### Create User Induction
Creates a User Induction.

- Type: write · Key: `create_user_induction`
- Requires: user, induction
- Optional: description, expiry_time, issue_date
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_user_induction" })`
- CLI: `npx zapier-sdk run-action assignar write create_user_induction`

##### Create Work Item
Creates a work item in Assignar

- Type: write · Key: `create_work_item`
- Requires: code, label
- SDK: `runAction({ app: "assignar", actionType: "write", action: "create_work_item" })`
- CLI: `npx zapier-sdk run-action assignar write create_work_item`

##### Find Specific Charge Items 
Find attributes for a given Charge Item ID

- Type: write · Key: `find_specific_charge_items`
- Requires: id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "find_specific_charge_items" })`
- CLI: `npx zapier-sdk run-action assignar write find_specific_charge_items`

##### Send Email
Sends an Email through Assignar Platform.

- Type: write · Key: `send_email`
- Requires: to, subject, message
- Optional: cc, bcc
- SDK: `runAction({ app: "assignar", actionType: "write", action: "send_email" })`
- CLI: `npx zapier-sdk run-action assignar write send_email`

##### Update Activity
Updates Activity

- Type: write · Key: `update_activity`
- Requires: id, activity_name
- Optional: integration_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_activity" })`
- CLI: `npx zapier-sdk run-action assignar write update_activity`

##### Update Asset
Updates an Asset

- Type: write · Key: `update_asset`
- Requires: id, name
- Optional: external_identifier, integration_id, description, rego_number, year, make, model, serial_number, charge_rate, number_reading, tag_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_asset" })`
- CLI: `npx zapier-sdk run-action assignar write update_asset`

##### Update Charge Code
Updates Charge Code

- Type: write · Key: `update_charge_code`
- Requires: id
- Optional: code, label, integration_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_charge_code" })`
- CLI: `npx zapier-sdk run-action assignar write update_charge_code`

##### Update Client
Creates a Client

- Type: write · Key: `update_client`
- Requires: id, name, active
- Optional: integration_id, abn, email, office_phone, mobile, address_1, address_2, city, postcode, state, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_client" })`
- CLI: `npx zapier-sdk run-action assignar write update_client`

##### Update Contact
Updates a Contact

- Type: write · Key: `update_contact`
- Requires: id, first_name, last_name
- Optional: company, office_phone, mobile, email, job_title, address_1, address_2, city, state, postcode, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_contact" })`
- CLI: `npx zapier-sdk run-action assignar write update_contact`

##### Update Order
Updates an existing Order in Assignar.

- Type: write · Key: `update_order`
- Requires: order
- Optional: status, job_number, integration_id, po_number, job_description, owner, comments, supplier, end_date
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_order" })`
- CLI: `npx zapier-sdk run-action assignar write update_order`

##### Update Project
Updates a Project

- Type: write · Key: `update_project_v2`
- Requires: id, project_name, is_active
- Optional: integration_id, address, suburb, postcode, state, tag_id, activity_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_project_v2" })`
- CLI: `npx zapier-sdk run-action assignar write update_project_v2`

##### Update Supplier
Updates a Supplier

- Type: write · Key: `update_supplier`
- Requires: id, name
- Optional: abn, email, office_phone, mobile, address_1, address_2, city, postcode, state, comments
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_supplier" })`
- CLI: `npx zapier-sdk run-action assignar write update_supplier`

##### Update Task
Updates a Task.

- Type: write · Key: `update_task`
- Requires: id, task_name, is_active
- Optional: req_machines, integration_id
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_task" })`
- CLI: `npx zapier-sdk run-action assignar write update_task`

##### Update User
Updates a User.

- Type: write · Key: `update_user`
- Requires: id
- Optional: first_name, last_name, employee_id, integration_id, username, employment_type, dob, email, contact, address, suburb, state, postcode, comments, active
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_user" })`
- CLI: `npx zapier-sdk run-action assignar write update_user`

##### Update User Competency
Updates an existing User Competency

- Type: write · Key: `update_user_competency`
- Requires: user, competency
- Optional: expiry_time, description, issue_date
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_user_competency" })`
- CLI: `npx zapier-sdk run-action assignar write update_user_competency`

##### Update User Induction
Updates an existing User Induction.

- Type: write · Key: `update_user_induction`
- Requires: user, induction
- Optional: expiry_time, description, issue_date
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_user_induction" })`
- CLI: `npx zapier-sdk run-action assignar write update_user_induction`

##### Update Work Item
Update a work item description in Assignar

- Type: write · Key: `update_work_item`
- Requires: id, label
- SDK: `runAction({ app: "assignar", actionType: "write", action: "update_work_item" })`
- CLI: `npx zapier-sdk run-action assignar write update_work_item`

#### Queries (28)

Queries read from Assignar and return data. They change nothing.

##### Find Activity
Finds an Activity

- Type: search · Key: `find_activity`
- Requires: nothing
- Optional: external_identifier, activity_name, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_activity" })`
- CLI: `npx zapier-sdk run-action assignar search find_activity`

##### Find Asset
Finds an Asset.

- Type: search · Key: `find_asset`
- Requires: nothing
- Optional: external_identifier, name, rego_number, serial_number, id, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_asset" })`
- CLI: `npx zapier-sdk run-action assignar search find_asset`

##### Find Asset by Id
Finds an Asset by Assignar Identifier.

- Type: search · Key: `find_asset_by_id`
- Requires: asset
- Optional: display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_asset_by_id" })`
- CLI: `npx zapier-sdk run-action assignar search find_asset_by_id`

##### Find Charge Code
Finds a Charge Code

- Type: search · Key: `find_charge_code`
- Requires: nothing
- Optional: id, code, label, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_charge_code" })`
- CLI: `npx zapier-sdk run-action assignar search find_charge_code`

##### Find Charge Items
Finds all the charge items for a timesheet.

- Type: search · Key: `find_charge_items`
- Requires: timesheet_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_charge_items" })`
- CLI: `npx zapier-sdk run-action assignar search find_charge_items`

##### Find Client
Finds a Client.

- Type: search · Key: `find_client`
- Requires: nothing
- Optional: external_identifier, client_name, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_client" })`
- CLI: `npx zapier-sdk run-action assignar search find_client`

##### Find Competency
Finds a Competency.

- Type: search · Key: `find_competency`
- Requires: name
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_competency" })`
- CLI: `npx zapier-sdk run-action assignar search find_competency`

##### Find Contact
Finds a Contact

- Type: search · Key: `find_contact`
- Requires: nothing
- Optional: external_identifier, email, mobile
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_contact" })`
- CLI: `npx zapier-sdk run-action assignar search find_contact`

##### Find Digital Docket
Finds a Digital Docket.

- Type: search · Key: `find_digital_docket`
- Requires: nothing
- Optional: docketId, projectId, orderId, clientId
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_digital_docket" })`
- CLI: `npx zapier-sdk run-action assignar search find_digital_docket`

##### Find Digital Docket Time Entries
Finds Digital Docket Time Entries. 

- Type: search · Key: `find_digital_docket_time_entries`
- Requires: docketId
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_digital_docket_time_entries" })`
- CLI: `npx zapier-sdk run-action assignar search find_digital_docket_time_entries`

##### Find Digital Docket Worker Questions
Finds Digital Docket Worker Questions. 

- Type: search · Key: `find_digital_docket_worker_questions`
- Requires: docketId
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_digital_docket_worker_questions" })`
- CLI: `npx zapier-sdk run-action assignar search find_digital_docket_worker_questions`

##### Find Induction
Finds an Induction.

- Type: search · Key: `find_induction`
- Requires: name
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_induction" })`
- CLI: `npx zapier-sdk run-action assignar search find_induction`

##### Find Order
Finds an Order using an id

- Type: search · Key: `find_order`
- Requires: id
- Optional: display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_order" })`
- CLI: `npx zapier-sdk run-action assignar search find_order`

##### Find Order by WO
Finds the order id using WO

- Type: search · Key: `find_order_by_wo`
- Requires: job_number
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_order_by_wo" })`
- CLI: `npx zapier-sdk run-action assignar search find_order_by_wo`

##### Find Order Charge Items
Finds a Order Charge Item.

- Type: search · Key: `find_order_charge_items`
- Requires: orderId
- Optional: ordertaskId
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_order_charge_items" })`
- CLI: `npx zapier-sdk run-action assignar search find_order_charge_items`

##### Find Order Tasks
Finds Tasks for a given Order.

- Type: search · Key: `find_order_tasks`
- Requires: order
- Optional: task, start_time, end_time
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_order_tasks" })`
- CLI: `npx zapier-sdk run-action assignar search find_order_tasks`

##### Find Project
Finds a Project

- Type: search · Key: `find_project`
- Requires: nothing
- Optional: external_identifier, project_name, id, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_project" })`
- CLI: `npx zapier-sdk run-action assignar search find_project`

##### Find a Project Work Item
Finds work items for a given project based on id.

- Type: search · Key: `find_project_work_items`
- Requires: nothing
- Optional: project_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_project_work_items" })`
- CLI: `npx zapier-sdk run-action assignar search find_project_work_items`

##### Find Relational Contact
Finds a Contact that is associated with a Client or Project.

- Type: search · Key: `find_relational_contact`
- Requires: contact
- Optional: client, project
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_relational_contact" })`
- CLI: `npx zapier-sdk run-action assignar search find_relational_contact`

##### Find Supplier
Finds a Supplier

- Type: search · Key: `find_supplier`
- Requires: nothing
- Optional: external_identifier, supplier_name
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_supplier" })`
- CLI: `npx zapier-sdk run-action assignar search find_supplier`

##### Find Tag
Finds a Tag in Assignar.

- Type: search · Key: `find_tag`
- Requires: taxonomy, name
- Optional: description
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_tag" })`
- CLI: `npx zapier-sdk run-action assignar search find_tag`

##### Find Task
Finds a Task in Assignar

- Type: search · Key: `find_task`
- Requires: nothing
- Optional: external_identifier, task_name, id, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_task" })`
- CLI: `npx zapier-sdk run-action assignar search find_task`

##### Find Timesheet
Finds a Timesheet.

- Type: search · Key: `find_timesheet`
- Requires: nothing
- Optional: id, project_id, order_id, job_number, user_id, display_integration_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_timesheet" })`
- CLI: `npx zapier-sdk run-action assignar search find_timesheet`

##### Find a Timesheet Work Item
Finds work items for a given timesheet based on id.

- Type: search · Key: `find_timesheet_work_item`
- Requires: nothing
- Optional: timesheet_id
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_timesheet_work_item" })`
- CLI: `npx zapier-sdk run-action assignar search find_timesheet_work_item`

##### Find User
Finds a User in Assignar

- Type: search · Key: `find_user`
- Requires: user_type_id
- Optional: active, username, employee_identifier, id, display_integration_id, email
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_user" })`
- CLI: `npx zapier-sdk run-action assignar search find_user`

##### Find User Competency
Finds an existing competency for a user.

- Type: search · Key: `find_user_competency`
- Requires: user, competency
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_user_competency" })`
- CLI: `npx zapier-sdk run-action assignar search find_user_competency`

##### Find User Induction
Finds an existing induction for a user.

- Type: search · Key: `find_user_induction`
- Requires: user, induction
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_user_induction" })`
- CLI: `npx zapier-sdk run-action assignar search find_user_induction`

##### Find Work Item
Finds a work item based on id or code.

- Type: search · Key: `find_work_item`
- Requires: nothing
- Optional: id, code
- SDK: `runAction({ app: "assignar", actionType: "search", action: "find_work_item" })`
- CLI: `npx zapier-sdk run-action assignar search find_work_item`

#### Search or Write Actions (13)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Activities
Finds an Activity

- Type: search_or_write · Key: `find_activity`
- Requires: activity_name
- Optional: external_identifier, display_integration_id, integration_id
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_activity" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_activity`

##### Find or Create an Asset
Finds an Asset.

- Type: search_or_write · Key: `find_asset`
- Requires: name
- Optional: external_identifier, rego_number, serial_number, id, display_integration_id, integration_id, description, year, make, model, charge_rate, number_reading, tag_id
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_asset" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_asset`

##### Find or Create Client
Finds a Client.

- Type: search_or_write · Key: `find_client`
- Requires: name, is_active
- Optional: external_identifier, client_name, display_integration_id, integration_id, abn, email, office_phone, mobile, address_1, address_2, city, postcode, state, comments
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_client" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_client`

##### Find or Create Competency
Finds a Competency.

- Type: search_or_write · Key: `find_competency`
- Requires: name
- Optional: exp_req, issue_req
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_competency" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_competency`

##### Find or Create Contact
Finds a Contact

- Type: search_or_write · Key: `find_contact`
- Requires: first_name, last_name
- Optional: external_identifier, email, mobile, external_id, company, office_phone, job_title, address_1, address_2, city, state, postcode, comments
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_contact" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_contact`

##### Find or Create Induction
Finds an Induction.

- Type: search_or_write · Key: `find_induction`
- Requires: name
- Optional: exp_req, issue_req
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_induction" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_induction`

##### Find or Create Order
Finds the order id using WO

- Type: search_or_write · Key: `find_order_by_wo`
- Requires: job_number, active, client_id, start_date, end_date, order_status
- Optional: project_id, job_description, location, location2, integration_id, po_number, supplier_id, comments
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_order_by_wo" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_order_by_wo`

##### Find or Create Project
Finds a Project

- Type: search_or_write · Key: `find_project`
- Requires: project_name, client, is_active
- Optional: external_identifier, id, display_integration_id, project_external_identifier, integration_id, address, suburb, postcode, state, parent_id, tag_id, activity_id
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_project" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_project`

##### Find or Create a Relational Contact
Finds a Contact that is associated with a Client or Project.

- Type: search_or_write · Key: `find_relational_contact`
- Requires: contact
- Optional: client, project
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_relational_contact" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_relational_contact`

##### Find or Create Task
Finds a Task in Assignar

- Type: search_or_write · Key: `find_task`
- Requires: name, is_active
- Optional: external_identifier, task_name, id, display_integration_id, integration_id, req_machines
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_task" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_task`

##### Find or Create Users
Finds a User in Assignar

- Type: search_or_write · Key: `find_user`
- Requires: user_type_id, username, first_name, last_name, employment_type, password, retype_password
- Optional: active, employee_identifier, id, display_integration_id, email, integration_id, contact, address, suburb, state, postcode, dob, comments
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_user" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_user`

##### Find or Create User Competency
Finds an existing competency for a user.

- Type: search_or_write · Key: `find_user_competency`
- Requires: user, competency
- Optional: description, expiry_time, issue_date
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_user_competency" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_user_competency`

##### Find or Create User Induction
Finds an existing induction for a user.

- Type: search_or_write · Key: `find_user_induction`
- Requires: user, induction
- Optional: description, expiry_time, issue_date
- SDK: `runAction({ app: "assignar", actionType: "search_or_write", action: "find_user_induction" })`
- CLI: `npx zapier-sdk run-action assignar search_or_write find_user_induction`

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Assignar integrations: zapier.com/apps/assignar/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/assignar
- SDK: npmjs.com/package/@zapier/zapier-sdk