# Oracle Primavera Cloud + Asana Integrations: Connect with Zapier MCP
> zapier.com/apps/oracle-primavera-cloud/integrations/asana
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

Integrate Oracle Primavera Cloud and Asana in minutes. Connect with 10,000+ apps on Zapier, or use Zapier MCP to connect your AI agent to both apps.

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Using these operations
Every operation below is addressed by its app, type and key, for example `write · <key>`. Events from one app can start a run that calls functions in the other.

- **MCP**: connect each app through mcp.zapier.com to expose its operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`, then call `runAction({ app, actionType, action, connection, inputs })`.
- **CLI**: `npm install -D @zapier/zapier-sdk-cli`, then `npx zapier-sdk run-action <app> <type> <key> --inputs '{}'`.

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `write · add_tag_to_task`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "asana", owner: "me" });

const { data } = await zapier.runAction({
  app: "asana",
  actionType: "write",
  action: "add_tag_to_task",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action asana write add_tag_to_task \
  --inputs '{}'
```

## Oracle Primavera Cloud

### Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

### Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

### Capabilities

#### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

##### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

##### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

##### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Asana

### Identity
Asana is a leading work management platform that helps teams orchestrate their work, from daily tasks to strategic initiatives. With Asana, organizations have a living system of clarity where everyone can see, discuss, and execute their team’s priorities.

- App slug: asana
- Operations published here: 41 (15 events, 13 functions, 11 queries, 2 search-or-write actions)

### Authentication
Zapier connects to Asana via oauth. Your code references a connection, not a raw credential.

- Auth type: oauth
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection asana
```

### Capabilities

#### Events (15)

Events fire when something happens in Asana. Use them to start a run.

##### Completed Task
Triggered when a task within a project, or any project within a workspace, is marked as completed. Does not trigger on completed subtasks.

- Type: read · Key: `completed_task_in_project`
- Requires: nothing
- Optional: workspace, project
- SDK: `runAction({ app: "asana", actionType: "read", action: "completed_task_in_project" })`
- CLI: `npx zapier-sdk run-action asana read completed_task_in_project`

##### New Task
Triggered when a Task is added to a Project.

- Type: read · Key: `new_task`
- Requires: workspace, project_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "new_task" })`
- CLI: `npx zapier-sdk run-action asana read new_task`

##### New Comment on a Task
Triggers when a new Comment is added to a Task in Asana.

- Type: read · Key: `new_task_comment`
- Requires: workspace, project_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "new_task_comment" })`
- CLI: `npx zapier-sdk run-action asana read new_task_comment`

##### New Project
Triggers when a new Project is created.

- Type: read · Key: `project_v2`
- Requires: workspace
- SDK: `runAction({ app: "asana", actionType: "read", action: "project_v2" })`
- CLI: `npx zapier-sdk run-action asana read project_v2`

##### New Story
Triggered when you add a new story.

- Type: read · Key: `story`
- Requires: project
- Optional: task, workspace
- SDK: `runAction({ app: "asana", actionType: "read", action: "story" })`
- CLI: `npx zapier-sdk run-action asana read story`

##### New Completed Subtask
Triggers when a Subtask is completed in Asana.

- Type: read · Key: `subtask_completed`
- Requires: workspace, project_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "subtask_completed" })`
- CLI: `npx zapier-sdk run-action asana read subtask_completed`

##### New Subtask
Triggered when you add a new subtask.

- Type: read · Key: `subtask_v2`
- Requires: workspace, project_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "subtask_v2" })`
- CLI: `npx zapier-sdk run-action asana read subtask_v2`

##### New Tag Created
Triggered when you create a new tag.

- Type: read · Key: `tag`
- Requires: nothing
- SDK: `runAction({ app: "asana", actionType: "read", action: "tag" })`
- CLI: `npx zapier-sdk run-action asana read tag`

##### New Attachment Added to Task
Triggers when an attachment is added to a task.

- Type: read · Key: `task_attachment`
- Requires: workspace, resource
- SDK: `runAction({ app: "asana", actionType: "read", action: "task_attachment" })`
- CLI: `npx zapier-sdk run-action asana read task_attachment`

##### Task Moved to Section
Triggers when a Task is moved to a section.

- Type: read · Key: `task_moved_to_section`
- Requires: workspace, project, section_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "task_moved_to_section" })`
- CLI: `npx zapier-sdk run-action asana read task_moved_to_section`

##### Tag Added to Task
Triggered when a Tag is added to a Task.

- Type: read · Key: `task_tagged`
- Requires: workspace, project_id
- SDK: `runAction({ app: "asana", actionType: "read", action: "task_tagged" })`
- CLI: `npx zapier-sdk run-action asana read task_tagged`

##### New Team
Triggered when you add a new team.

- Type: read · Key: `team`
- Requires: workspace
- SDK: `runAction({ app: "asana", actionType: "read", action: "team" })`
- CLI: `npx zapier-sdk run-action asana read team`

##### Updated Task
Triggered when a Task is updated in a Project.

- Type: read · Key: `updated_task`
- Requires: workspace, project_id
- Optional: trigger_on_subtasks, disclaimer
- SDK: `runAction({ app: "asana", actionType: "read", action: "updated_task" })`
- CLI: `npx zapier-sdk run-action asana read updated_task`

##### New User
Triggered when you add a new user.

- Type: read · Key: `user`
- Requires: nothing
- Optional: workspace
- SDK: `runAction({ app: "asana", actionType: "read", action: "user" })`
- CLI: `npx zapier-sdk run-action asana read user`

##### New Workspace/Organization
Triggered when you add a new workspace/organization.

- Type: read · Key: `workspace`
- Requires: nothing
- SDK: `runAction({ app: "asana", actionType: "read", action: "workspace" })`
- CLI: `npx zapier-sdk run-action asana read workspace`

#### Functions (13)

Functions change something in Asana.

##### Add Tag to Task
Adds a tag to an existing task.

- Type: write · Key: `add_tag_to_task`
- Requires: task_id, tag
- SDK: `runAction({ app: "asana", actionType: "write", action: "add_tag_to_task" })`
- CLI: `npx zapier-sdk run-action asana write add_tag_to_task`

##### Add Task to Section of Project
Adds a Task to a Section of a Project.

- Type: write · Key: `add_task_to_section`
- Requires: task_id, workspace, projects, section
- Optional: position, position_task_id
- SDK: `runAction({ app: "asana", actionType: "write", action: "add_task_to_section" })`
- CLI: `npx zapier-sdk run-action asana write add_task_to_section`

##### Attach File
Attaches a File to a task.

- Type: write · Key: `attach_file`
- Requires: project, task, file
- SDK: `runAction({ app: "asana", actionType: "write", action: "attach_file" })`
- CLI: `npx zapier-sdk run-action asana write attach_file`

##### Create Duplicate Task
Duplicates an existing task.

- Type: write · Key: `create_duplicate_task`
- Requires: name
- Optional: helptext, workspace, project, tag, fields
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_duplicate_task" })`
- CLI: `npx zapier-sdk run-action asana write create_duplicate_task`

##### Create Project From Template
Creates a new project from a custom template.

- Type: write · Key: `create_project_from_template`
- Requires: project_template_gid, name
- Optional: workspace, privacy_setting
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_project_from_template" })`
- CLI: `npx zapier-sdk run-action asana write create_project_from_template`

##### Create Section
Creates a new section within a project.

- Type: write · Key: `create_section`
- Requires: workspace, project, name
- Optional: insert_after, insert_before
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_section" })`
- CLI: `npx zapier-sdk run-action asana write create_section`

##### Create Subtask
Adds a Subtask to an existing Task.

- Type: write · Key: `create_subtask_v3`
- Requires: workspace, task_id
- Optional: name, notes, html, completed, liked, assignee, followers, tags, custom_field_info
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_subtask_v3" })`
- CLI: `npx zapier-sdk run-action asana write create_subtask_v3`

##### Create Task From Template
Creates a new task in Asana from a selected template.

- Type: write · Key: `create_task_from_template`
- Requires: workspace, template_id
- Optional: copy, project_id, name
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_task_from_template" })`
- CLI: `npx zapier-sdk run-action asana write create_task_from_template`

##### Create Task
Creates a new task in Asana with specified details.

- Type: write · Key: `create_task_v2`
- Requires: workspace, task_name
- Optional: description, use_rich_text, assignee, followers, tags, completed, liked, custom_field_info
- SDK: `runAction({ app: "asana", actionType: "write", action: "create_task_v2" })`
- CLI: `npx zapier-sdk run-action asana write create_task_v2`

##### Create Project
Adds a new project.

- Type: write · Key: `project`
- Requires: workspace, name, notes
- Optional: team
- SDK: `runAction({ app: "asana", actionType: "write", action: "project" })`
- CLI: `npx zapier-sdk run-action asana write project`

##### Remove Tag from Task
Removes a tag from an existing task.

- Type: write · Key: `remove_tag_from_task`
- Requires: task_id, tag
- SDK: `runAction({ app: "asana", actionType: "write", action: "remove_tag_from_task" })`
- CLI: `npx zapier-sdk run-action asana write remove_tag_from_task`

##### Create Comment/Story
Adds a comment or story to a task.

- Type: write · Key: `story`
- Requires: workspace, project, task, text
- Optional: mentions_copy, mentions, mention_position
- SDK: `runAction({ app: "asana", actionType: "write", action: "story" })`
- CLI: `npx zapier-sdk run-action asana write story`

##### Update Task
Updates multiple properties of an existing Asana task. This is a comprehensive update action that can modify task details, assignment, dates, followers, tags, and custom fields in a single operation.

- Type: write · Key: `update_task_v4`
- Requires: task_id
- Optional: workspace, completed, liked, name, assignee, followers, tags, notes, html, custom_field_info
- SDK: `runAction({ app: "asana", actionType: "write", action: "update_task_v4" })`
- CLI: `npx zapier-sdk run-action asana write update_task_v4`

#### Queries (11)

Queries read from Asana and return data. They change nothing.

##### Find All Tasks From Project
Searches for all tasks in a specific project with optional filters. Returns tasks as line items, up to 500 tasks.

- Type: search · Key: `find_all_tasks_from_project_v2`
- Requires: workspace, project
- Optional: completed_since, limit
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_all_tasks_from_project_v2" })`
- CLI: `npx zapier-sdk run-action asana search find_all_tasks_from_project_v2`

##### Find Project
Finds an existing project.

- Type: search · Key: `find_project`
- Requires: name
- Optional: workspace
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_project" })`
- CLI: `npx zapier-sdk run-action asana search find_project`

##### Find Project V2
Finds an existing project with enhanced filtering and search capabilities.

- Type: search · Key: `find_project_v2`
- Requires: name
- Optional: workspace, team, archived
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_project_v2" })`
- CLI: `npx zapier-sdk run-action asana search find_project_v2`

##### Find Section in Project
Finds an existing section within a workspace project.

- Type: search · Key: `find_section`
- Requires: workspace, project, name
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_section" })`
- CLI: `npx zapier-sdk run-action asana search find_section`

##### Find Task Attachments by Task ID
Finds all attachments for a specific task by its ID.

- Type: search · Key: `find_task_attachments`
- Requires: task_id
- Optional: workspace, projects, limit
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_task_attachments" })`
- CLI: `npx zapier-sdk run-action asana search find_task_attachments`

##### Find Task Comments
Finds comments for a specific task.

- Type: search · Key: `find_task_comments`
- Requires: task_id
- Optional: workspace, projects, limit, sort_order
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_task_comments" })`
- CLI: `npx zapier-sdk run-action asana search find_task_comments`

##### Find Task by ID
Finds an existing task by its ID.

- Type: search · Key: `find_task_id`
- Requires: id
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_task_id" })`
- CLI: `npx zapier-sdk run-action asana search find_task_id`

##### Find Tasks in Workspace
Searches for tasks in a workspace using Asana's search API. Returns multiple results as returned by the API. Supports custom fields and advanced filtering. Available only to premium Asana users.

- Type: search · Key: `find_task_in_workspace_v2`
- Requires: workspace
- Optional: premium_user_help_text, projects, text, limit, is_subtask, completed, sort_by, sort_ascending, has_attachment, is_blocking, is_blocked, created_after, created_before, modified_after, modified_before, resource_subtype, custom_fields_help_text
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_task_in_workspace_v2" })`
- CLI: `npx zapier-sdk run-action asana search find_task_in_workspace_v2`

##### Find Task in Project
Finds an existing task within a workspace project(s).

- Type: search · Key: `find_task_v3`
- Requires: workspace, project, name
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_task_v3" })`
- CLI: `npx zapier-sdk run-action asana search find_task_v3`

##### Find User
Finds an existing user of your Asana account.

- Type: search · Key: `find_user`
- Requires: email
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_user" })`
- CLI: `npx zapier-sdk run-action asana search find_user`

##### Find User V2
Finds an existing user of your Asana account with enhanced search capabilities.

- Type: search · Key: `find_user_v2`
- Requires: email
- SDK: `runAction({ app: "asana", actionType: "search", action: "find_user_v2" })`
- CLI: `npx zapier-sdk run-action asana search find_user_v2`

#### Search or Write Actions (2)

These operations search for a match first, and create one only if nothing is found.

##### Find or Create Project
Find or Create Project

- Type: search_or_write · Key: `find_project`
- Requires: workspace, name, notes
- Optional: team
- SDK: `runAction({ app: "asana", actionType: "search_or_write", action: "find_project" })`
- CLI: `npx zapier-sdk run-action asana search_or_write find_project`

##### Find or Create Task
Find or Create Task

- Type: search_or_write · Key: `find_task_id`
- Requires: id, workspace
- Optional: name, notes, html, completed, liked, assignee, followers, tags, custom_field_info
- SDK: `runAction({ app: "asana", actionType: "search_or_write", action: "find_task_id" })`
- CLI: `npx zapier-sdk run-action asana search_or_write find_task_id`

## Frequently asked questions about automating with Oracle Primavera Cloud and Asana

### How do I integrate Oracle Primavera Cloud with Asana?

To integrate Oracle Primavera Cloud with Asana, you'll need to use our platform to set up a connection. This involves creating Zaps where Oracle Primavera Cloud events trigger actions in Asana, such as creating tasks or updating project details.

### What are the main triggers available when integrating Oracle Primavera Cloud with Asana?

The main triggers include new project creation, task updates, and schedule changes in Oracle Primavera Cloud. These triggers can prompt automatic actions in Asana like task creation or updating existing task details.

### Can I automate task creation in Asana from Oracle Primavera Cloud updates?

Yes, you can automate the creation of tasks in Asana based on specific updates or changes made in Oracle Primavera Cloud by setting appropriate triggers and actions on our integration platform.

### Is it possible to update tasks in Oracle Primavera from Asana comments?

While direct update of tasks based on comments is not supported, you can create a workflow where comments or status changes in Asana generate alerts for manual review and update in Oracle Primavera.

### What should I do if my data sync between Oracle Primavera Cloud and Asana fails?

In case of a sync failure, check your connection settings and ensure that all authentication details are correct. Reviewing the Zap's historical logs can help identify any specific issues causing the failure.

### Are there pre-built integration templates for connecting Oracle Primavera Cloud with Asana?

Yes, we offer several pre-built Zap templates that facilitate common integrations between Oracle Primavera Cloud and Asana. These templates often cover typical triggers like project updates leading to task assignments.

### Can project deadlines from Oracle Primavera be synced automatically to corresponding tasks in Asana?

Absolutely. By setting up a suitable Zap with our tool, you can ensure that project deadlines updated or created within Oracle Primavera are reflected as due dates on corresponding tasks within Asana.

### My AI agent already connects to my apps. Why add Zapier?

Your AI agent’s built-in or native connectors cover a limited set of popular apps. Zapier reaches 10,000+ apps and 90,000+ triggers and actions. Zapier also adds what your AI agent can’t: one place to manage logins and credentials, so you never paste an API key; automations that keep running after the chat closes, with fixes you can review when a run hits a snag; and the freedom to switch agent interfaces without starting over.

### Can’t my AI agent already run tasks on a schedule?

Most popular AI agents can run scheduled tasks. And for simple recurring jobs, that might be all you need. Automations that run on Zapier can run on a schedule too, but they can also start the moment something happens in your apps—like when a new lead/ticket comes in or you get an email reply. Zapier also uses AI only in the steps that need judgment, so routine steps like posting to Slack or updating Salesforce don’t burn model tokens.

### Why not have my AI agent write me a script?

You can, and the first version will probably work. The trouble comes later: a script needs somewhere to run, a way to hear about events, and someone to keep it going. If an API changes or a login expires, your script can quietly stop until you notice. It also holds your keys, often in a repo, where a leak can expose your accounts. With Zapier, your agent builds the automation, and you publish it. Zapier hosts it, handles your logins and credentials, and records every run. If a run fails, Zapier diagnoses what went wrong and prepares a fix you can review. Or you can decide which fixes Zapier can apply for you.

## Links
- Oracle Primavera Cloud integrations: zapier.com/apps/oracle-primavera-cloud/integrations.md
- Asana integrations: zapier.com/apps/asana/integrations.md
- Full page: zapier.com/apps/oracle-primavera-cloud/integrations/asana
- SDK: npmjs.com/package/@zapier/zapier-sdk