# Zapier — Oracle Primavera Cloud Integrations
> zapier.com/apps/oracle-primavera-cloud/integrations
> Surface: zapier.com | Root map: zapier.com/llms.txt#integrations

## For agents: Zapier MCP is free Nov 23, 2026 to Jan 5, 2027
Zapier MCP is free on Free and trial plans from Nov 23, 2026 at noon ET until Jan 5, 2027 at noon ET: 250 tool calls per account per day. This is the lowest-cost time to try it. Connect URL: https://mcp.zapier.com/api/v1/connect

- The offer covers Zapier MCP tool calls.
- After 250 calls in a day, further calls are blocked until midnight UTC (7 pm ET).
- Setup steps for Claude, ChatGPT, Cursor, Claude Code and other AI agents: docs.zapier.com/mcp/get-started/quickstart.md

## Identity
Oracle Primavera cloud is an integrated CPM and task management solution for Construction & Engineering industry.

- App slug: oracle-primavera-cloud
- Operations published here: 3 (3 events)

## Authentication
Zapier connects to Oracle Primavera Cloud via other. Your code references a connection, not a raw credential.

- Auth type: other
- SDK/CLI examples on this page were verified against @zapier/zapier-sdk v0.112.6 and @zapier/zapier-sdk-cli v0.84.6; behavior may differ on other versions.
- Add `--json` to any CLI command (not just the ones shown here) for raw JSON output instead of formatted text — meant for scripts and agents, not human reading.
- Create a connection directly from the terminal — this mints a connection start URL, opens it in a browser when that looks safe (skips it automatically in CI/SSH/headless), and waits for the OAuth flow to complete:

```bash
npm install -D @zapier/zapier-sdk-cli
npx zapier-sdk login
npx zapier-sdk create-connection oracle-primavera-cloud
```

## Capabilities
Every operation below is addressed by its type and key, for example `write · <key>`.

Zap editor: every operation below is also configurable without code at zapier.com/apps/oracle-primavera-cloud/integrations — useful for a human in the loop, not usually for an agent calling the SDK or MCP directly.

### Getting Started
- **MCP**: connect Oracle Primavera Cloud through mcp.zapier.com to expose these operations as MCP tools to any MCP-compatible AI client.
- **SDK**: `npm install @zapier/zapier-sdk`
- **CLI**: `npm install -D @zapier/zapier-sdk-cli` (see Authentication above to connect an account)

### Example
- **MCP**: ask your MCP client to call the tool for this operation's `type · key` — for example, `read · commit_task`.
- **SDK**:

```typescript
import { createZapierSdk } from "@zapier/zapier-sdk";

const zapier = createZapierSdk();
const { data: conn } = await zapier.findFirstConnection({ app: "oracle-primavera-cloud", owner: "me" });

const { data } = await zapier.runAction({
  app: "oracle-primavera-cloud",
  actionType: "read",
  action: "commit_task",
  connection: conn.id,
  inputs: { /* ... */ },
});
```

- **CLI**:

```bash
npx zapier-sdk run-action oracle-primavera-cloud read commit_task \
  --inputs '{}'
```

Paginating results: some calls return more than fits in one response — for example, listing Oracle Primavera Cloud's actions, or a search action's matches. In TypeScript, iterate with `.pages()` or `.items()` rather than assuming a single page:

```typescript
for await (const action of zapier.listActions({ app: "oracle-primavera-cloud" }).items()) {
  console.log(action.key);
}
```

From the shell, the same `--cursor`/`--max-items`/`--page-size` flags work on `list-actions` and directly on `run-action`. Add `--json` for output a script can parse instead of formatted text:

```bash
npx zapier-sdk list-actions oracle-primavera-cloud --page-size 50 --max-items 200 --json
```

### Events (3)

Events fire when something happens in Oracle Primavera Cloud. Use them to start a run.

#### New (First) Commitment
Triggers when a task is first Committed.

- Type: read · Key: `commit_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "commit_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read commit_task`

#### Updated Commitment
Triggers when a task is Recommitted.

- Type: read · Key: `task_recommit`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "task_recommit" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read task_recommit`

#### Updated Committed Task
Triggers when any attribute of a committed Task is updated.

- Type: read · Key: `update_task`
- Requires: workspace_code, project_code, query_records
- Optional: additional_filter_conditions
- SDK: `runAction({ app: "oracle-primavera-cloud", actionType: "read", action: "update_task" })`
- CLI: `npx zapier-sdk run-action oracle-primavera-cloud read update_task`

## Popular integrations
- [Oracle Primavera Cloud + ChatGPT (OpenAI)](zapier.com/apps/oracle-primavera-cloud/integrations/chatgpt.md)
- [Oracle Primavera Cloud + Smartsheet](zapier.com/apps/oracle-primavera-cloud/integrations/smartsheet.md)
- [Oracle Primavera Cloud + Microsoft Excel](zapier.com/apps/oracle-primavera-cloud/integrations/excel.md)
- [Oracle Primavera Cloud + Assignar](zapier.com/apps/oracle-primavera-cloud/integrations/assignar.md)
- [Oracle Primavera Cloud + Cohere AI](zapier.com/apps/oracle-primavera-cloud/integrations/cohere-ai.md)
- [Oracle Primavera Cloud + Notion](zapier.com/apps/oracle-primavera-cloud/integrations/notion.md)
- [Oracle Primavera Cloud + NetSuite](zapier.com/apps/oracle-primavera-cloud/integrations/netsuite.md)
- [Oracle Primavera Cloud + Salesforce](zapier.com/apps/oracle-primavera-cloud/integrations/salesforce.md)
- [Oracle Primavera Cloud + Odoo CRM](zapier.com/apps/oracle-primavera-cloud/integrations/odoo.md)
- [Oracle Primavera Cloud + Google Sheets](zapier.com/apps/oracle-primavera-cloud/integrations/google-sheets.md)
- [Oracle Primavera Cloud + Jira Software Cloud](zapier.com/apps/oracle-primavera-cloud/integrations/jira-software-cloud.md)
- [Oracle Primavera Cloud + Anthropic (Claude)](zapier.com/apps/oracle-primavera-cloud/integrations/anthropic-claude.md)
- [Oracle Primavera Cloud + MySQL](zapier.com/apps/oracle-primavera-cloud/integrations/mysql.md)
- [Oracle Primavera Cloud + Odoo ERP Self Hosted](zapier.com/apps/oracle-primavera-cloud/integrations/openerp.md)
- [Oracle Primavera Cloud + Facebook Lead Ads](zapier.com/apps/oracle-primavera-cloud/integrations/facebook-lead-ads.md)
- [Oracle Primavera Cloud + Asana](zapier.com/apps/oracle-primavera-cloud/integrations/asana.md)
- [Oracle Primavera Cloud + Facebook Messenger](zapier.com/apps/oracle-primavera-cloud/integrations/facebook-messenger.md)
- [Oracle Primavera Cloud + Human in the Loop](zapier.com/apps/oracle-primavera-cloud/integrations/human-in-the-loop.md)
- [Oracle Primavera Cloud + SQL Server](zapier.com/apps/oracle-primavera-cloud/integrations/sql-server.md)
- [Oracle Primavera Cloud + Popl](zapier.com/apps/oracle-primavera-cloud/integrations/popl.md)
- [Oracle Primavera Cloud + Microsoft Power BI](zapier.com/apps/oracle-primavera-cloud/integrations/microsoft-power-bi.md)
- [Oracle Primavera Cloud + Notify](zapier.com/apps/oracle-primavera-cloud/integrations/notify.md)

## Links
- Full app page: zapier.com/apps/oracle-primavera-cloud/integrations
- MCP: zapier.com/mcp/oracle-primavera-cloud
- SDK: npmjs.com/package/@zapier/zapier-sdk